Assessment Year | 2004 |
---|---|
Principal Product | HAIR CARE PRODUCTS |
NAICS | 325620: Toilet Preparation Manufacturing |
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
220,000
ft2
|
Annual Production | 40,000,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $166,406 | 4,298,206 |
kWh
|
$0.039 |
Electricity Demand | $117,671 | 10,431 |
kW-mo/yr
|
$11.28 |
Electricity Fees | $19,110 | - |
|
- |
Natural Gas | $50,903 | 5,915 |
MMBtu
|
$8.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.8112: Combine utility meters | $5,142 | $8,000 | - | - | $5,142 | |
02 | 2.4314: Use synthetic lubricant | $2,500 | - |
$1,470
33,750
kWh
|
$1,030
-
kW-mo/yr
|
- | |
03 | 2.4235: Remove or close off unneeded compressed air lines | $2,040 | - |
$1,200
27,500
kWh
|
$840
-
kW-mo/yr
|
- | |
04 | 2.6211: Conserve energy by efficient use of vending machines | $270 | $758 |
$270
6,569
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,280 | $2 |
$750
17,250
kWh
|
$530
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $480 | $1,850 |
$265
6,063
kWh
|
$215
-
kW-mo/yr
|
- | |
07 | 2.4226: Use / purchase optimum sized compressor | $1,890 | $8,000 |
$1,890
46,000
kWh
|
- | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $11,000 | $9,090 |
$5,330
122,600
kWh
|
$5,670
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $24,602 | $27,700 |
$11,175
259,732
kWh
|
$8,285
-
kW-mo/yr
|
$5,142 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs