ITAC Assessment: OK0745
ITAC logo
ITAC Assessment: OK0745
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aircraft transparencies
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 141,315
ft2
Annual Production 103,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $352,785 6,553,525
kWh
Electricity Demand $78,131 16,505
kW-mo/yr
Electricity Fees $2,270 -
Natural Gas $1,089,585 142,786
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $161,742 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $59,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,891 $360 $7,891
127,143
kWh
- - -
02 2.7241: Install outside air damper / economizer on hvac unit $57,727 $3,600 $57,727
1,575,510
kWh
- - -
03 2.2511: Insulate bare equipment $13,884 $4,859 - - - $13,884
-
MMBtu
04 2.2511: Insulate bare equipment $2,384 $744 - - - $2,384
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $2,437 $1,574 $2,437
36,923
kWh
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,998 $9,010 $6,068
163,571
kWh
$5,930
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $24,171 $81,808 $24,171
366,228
kWh
- - -
08 2.3212: Optimize plant power factor $1,509 $6,760 - - $1,509 -
09 2.2414: Use waste heat from hot flue gases to preheat $1,516 $7,600 - - - $1,516
-
MMBtu
10 2.4231: Reduce the pressure of compressed air to the minimum required $609 $3,125 $609
9,230
kWh
- - -
11 2.7425: Clean or color roof to reduce solar load $37,616 $286,361 $37,616
569,941
kWh
- - -
TOTAL RECOMMENDED $161,742 $405,801 $136,519
2,848,546
kWh
$5,930
-
kW-mo/yr
$1,509 $17,784
-
MMBtu
TOTAL IMPLEMENTED $59,391 $291,580 $45,507
697,084
kWh
- - $13,884
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs