Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,601

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0298 #08 Y:2024 Lower temperature during the winter season and vice-versa $63 -
IC0298 #07 Y:2024 Turn off equipment during breaks, reduce operating time $352 -
IC0298 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,839 -
IC0298 #05 Y:2024 Use solar heat to make electricty $216,800 $1,202,971
IC0298 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $14,618 $558
IC0298 #03 Y:2024 Install timers and/or thermostats $3,568 $280
IC0298 #02 Y:2024 Eliminate or reduce compressed air usage $19,913 $4,400
IC0298 #01 Y:2024 Eliminate or reduce compressed air usage $2,466 $2,200
UD1072 #07 Y:2023 Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $14,674 $67,830
UD1072 #06 Y:2023 Install occupancy sensors $1,343 $1,667
UD1072 #05 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,892 $12,650
UD1072 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $2,454 $952
UD1072 #03 Y:2023 Install / repair insulation on condensate lines $63 $216
UD1072 #02 Y:2023 Install / repair insulation on steam lines $3,199 $864
UD1072 #01 Y:2023 Turn off equipment during breaks, reduce operating time $5,741 $5,000
SJ0010 #08 Y:2023 Turn off equipment during breaks, reduce operating time $274 -
SJ0010 #07 Y:2023 Utilize higher efficiency lamps and/or ballasts $185 $786
SJ0010 #06 Y:2023 Install occupancy sensors $449 $178
SJ0010 #05 Y:2023 Utilize energy-efficient belts and other improved mechanisms $16 $39
SJ0010 #04 Y:2023 Insulate bare equipment $9,629 $1,369