Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,594

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0227 #04 Y:1994 Utilize energy-efficient belts and other improved mechanisms $578 -
WI0227 #03 Y:1994 Insulate bare equipment $1,090 $100
WI0227 #02 Y:1994 Reduce ventilation air $603 $1,000
WI0227 #01 Y:1994 Utilize higher efficiency lamps and/or ballasts $4,083 $4,041
AM0224 #04 Y:1994 Utilize higher efficiency lamps and/or ballasts $70 $26
AM0224 #03 Y:1994 Insulate bare equipment $355 $126
AM0224 #02 Y:1994 Utilize daylight whenever possible in lieu of artificial light $425 -
AM0224 #01 Y:1994 Eliminate leaks in inert gas and compressed air lines/ valves $6,090 $1,000
NC0037 #05 Y:1994 Insulate bare equipment $4,967 $536
NC0037 #04 Y:1994 Direct warmest air to combustion intake $420 $300
NC0037 #03 Y:1994 Utilize energy-efficient belts and other improved mechanisms $1,535 $4,662
NC0037 #02 Y:1994 Use most efficient type of electric motors $13,656 $28,570
NC0037 #01 Y:1994 Install compressor air intakes in coolest locations $494 $360
TN0516 #09 Y:1994 Turn off equipment during breaks, reduce operating time $161 $345
TN0516 #08 Y:1994 Insulate bare equipment $601 $430
TN0516 #07 Y:1994 Utilize higher efficiency lamps and/or ballasts $952 $796
TN0516 #06 Y:1994 Install compressor air intakes in coolest locations $1,597 $460
TN0516 #05 Y:1994 Turn off equipment when not in use $2,022 $3,735
TN0516 #04 Y:1994 Insulate bare equipment $14,244 $2,200
TN0516 #03 Y:1994 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,822 $26,900