Assessment Year | 1995 |
---|---|
Principal Product | Specialty Elastomerics |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 82 |
Plant Area |
41,254
ft2
|
Annual Production | 14,000
lb
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,161 | 1,228,605 |
kWh
|
$0.071 |
Natural Gas | $6,899 | 717 |
MMBtu
|
$9.62 |
Fuel Oil #1 | $10,693 | 2,472 |
MMBtu
|
$4.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,025 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,177 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #1 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,545 | $5,433 |
$1,545
21,102
kWh
|
- | - | |
02 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,479 | $3,771 |
$1,479
20,223
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,352 | $1,790 |
$1,352
18,464
kWh
|
- | - | |
04 | 2.1212: Operate boilers on high fire setting | $662 | $400 | - |
$662
-
MMBtu
|
- | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $550 | $1,199 |
$832
11,723
kWh
|
$(-282.0)
-
MMBtu
|
- | |
06 | 2.7135: Install occupancy sensors | $449 | $898 |
$449
8,499
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $370 | - |
$370
7,034
kWh
|
- | - | |
08 | 2.7111: Reduce illumination to minimum necessary levels | $318 | - |
$318
4,396
kWh
|
- | - | |
09 | 2.8112: Combine utility meters | $300 | - | - | - | $300 | |
TOTAL RECOMMENDED | $7,025 | $13,491 |
$6,345
91,441
kWh
|
$380
-
MMBtu
|
$300 | ||
TOTAL IMPLEMENTED | $4,177 | $7,623 |
$3,215
43,962
kWh
|
$662
-
MMBtu
|
$300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #1 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs