ITAC Assessment: MA0335
ITAC logo
ITAC Assessment: MA0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Specialty Elastomerics
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 82
Plant Area 41,254
ft2
Annual Production 14,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,161 1,228,605
kWh
Natural Gas $6,899 717
MMBtu
Fuel Oil #1 $10,693 2,472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,025 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,177

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,545 $5,433 $1,545
21,102
kWh
- -
02 2.2614: Use cooling tower or economizer to replace chiller cooling $1,479 $3,771 $1,479
20,223
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,352 $1,790 $1,352
18,464
kWh
- -
04 2.1212: Operate boilers on high fire setting $662 $400 - $662
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $550 $1,199 $832
11,723
kWh
$(-282.0)
-
MMBtu
-
06 2.7135: Install occupancy sensors $449 $898 $449
8,499
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $370 - $370
7,034
kWh
- -
08 2.7111: Reduce illumination to minimum necessary levels $318 - $318
4,396
kWh
- -
09 2.8112: Combine utility meters $300 - - - $300
TOTAL RECOMMENDED $7,025 $13,491 $6,345
91,441
kWh
$380
-
MMBtu
$300
TOTAL IMPLEMENTED $4,177 $7,623 $3,215
43,962
kWh
$662
-
MMBtu
$300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #1 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs