Assessment Year | 1995 |
---|---|
Principal Product | Printing blankets |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
140,000
ft2
|
Annual Production | 3,825
thousand feet
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $329,559 | 4,101,114 |
kWh
|
$0.080 |
Natural Gas | $246,765 | 63,491 |
MMBtu
|
$3.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,068 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,485 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,528 | $44,433 |
$16,528
205,744
kWh
|
- | - | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,793 | $9,350 |
$5,793
90,270
kWh
|
- | - | - | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $2,972 | $3,068 | - |
$2,972
-
MMBtu
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,889 | $540 |
$1,889
23,447
kWh
|
- | - | - | - | |
05 | 2.7134: Use photocell controls | $1,851 | $286 |
$1,851
23,154
kWh
|
- | - | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,432 | $3,380 |
$1,432
17,878
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $985 | $1,440 |
$985
12,309
kWh
|
- | - | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $477 | - |
$477
9,672
kWh
|
- | - | - | - | |
09 | 2.7135: Install occupancy sensors | $348 | $298 |
$348
4,396
kWh
|
- | - | - | - | |
10 | 3.8142: Distill contaminated solvents for reuse | $12,875 | $19,300 | - | - | - |
$12,875
-
gal
|
- | |
11 | 3.4115: Recover and reuse cooling water | $11,258 | $14,000 | - | - |
$11,258
-
Tgal
|
- | - | |
12 | 3.8143: Recycle cleaning solvent and reuse | $61,905 | $5,000 | - | - | - |
$61,905
-
gal
|
- | |
13 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,755 | $16,400 | - | - | - | - |
$1,755
-
lb
|
|
TOTAL RECOMMENDED | $120,068 | $117,495 |
$29,303
386,870
kWh
|
$2,972
-
MMBtu
|
$11,258
-
Tgal
|
$74,780
-
gal
|
$1,755
-
lb
|
||
TOTAL IMPLEMENTED | $23,485 | $63,099 |
$21,730
274,326
kWh
|
- | - | - |
$1,755
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs