ITAC Assessment: MA0328
ITAC logo
ITAC Assessment: MA0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Printing blankets
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 140,000
ft2
Annual Production 3,825
thousand feet
Production Hrs. Annual 6,600
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $329,559 4,101,114
kWh
Natural Gas $246,765 63,491
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,068 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $16,528 $44,433 $16,528
205,744
kWh
- - - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,793 $9,350 $5,793
90,270
kWh
- - - -
03 2.2414: Use waste heat from hot flue gases to preheat $2,972 $3,068 - $2,972
-
MMBtu
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,889 $540 $1,889
23,447
kWh
- - - -
05 2.7134: Use photocell controls $1,851 $286 $1,851
23,154
kWh
- - - -
06 2.4133: Use most efficient type of electric motors $1,432 $3,380 $1,432
17,878
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $985 $1,440 $985
12,309
kWh
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $477 - $477
9,672
kWh
- - - -
09 2.7135: Install occupancy sensors $348 $298 $348
4,396
kWh
- - - -
10 3.8142: Distill contaminated solvents for reuse $12,875 $19,300 - - - $12,875
-
gal
-
11 3.4115: Recover and reuse cooling water $11,258 $14,000 - - $11,258
-
Tgal
- -
12 3.8143: Recycle cleaning solvent and reuse $61,905 $5,000 - - - $61,905
-
gal
-
13 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,755 $16,400 - - - - $1,755
-
lb
TOTAL RECOMMENDED $120,068 $117,495 $29,303
386,870
kWh
$2,972
-
MMBtu
$11,258
-
Tgal
$74,780
-
gal
$1,755
-
lb
TOTAL IMPLEMENTED $23,485 $63,099 $21,730
274,326
kWh
- - - $1,755
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs