| Assessment Year | 1995 |
|---|---|
| Principal Product | Molded Rubber |
| NAICS |
n/a
|
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 73 |
| Plant Area |
102,000
ft2
|
| Annual Production | 500,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $155,150 | 1,832,356 |
kWh
|
$0.085 |
| Natural Gas | $55,721 | 15,214 |
MMBtu
|
$3.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,526 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,083 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,083 | $4,041 |
$4,083
48,359
kWh
|
- | - | - | |
| 02 | 2.7314: Reduce ventilation air | $603 | $1,000 |
$70
879
kWh
|
$533
-
MMBtu
|
- | - | |
| 03 | 2.2511: Insulate bare equipment | $1,090 | $100 |
$1,090
12,896
kWh
|
- | - | - | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $578 | - |
$578
6,741
kWh
|
- | - | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $293 | $640 |
$293
3,517
kWh
|
- | - | - | |
| 06 | 2.2612: Use cooling tower water instead of refrigeration | $16,579 | $22,000 | - | - |
$16,579
-
Tgal
|
- | |
| 07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,300 | - | - | - | - |
$1,300
-
lb
|
|
| TOTAL RECOMMENDED | $24,526 | $27,781 |
$6,114
72,392
kWh
|
$533
-
MMBtu
|
$16,579
-
Tgal
|
$1,300
-
lb
|
||
| TOTAL IMPLEMENTED | $4,083 | $4,041 |
$4,083
48,359
kWh
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs