ITAC Assessment: WI0227
ITAC logo
ITAC Assessment: WI0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Molded Rubber
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 73
Plant Area 102,000
ft2
Annual Production 500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $155,150 1,832,356
kWh
Natural Gas $55,721 15,214
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,526 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,083

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,083 $4,041 $4,083
48,359
kWh
- - -
02 2.7314: Reduce ventilation air $603 $1,000 $70
879
kWh
$533
-
MMBtu
- -
03 2.2511: Insulate bare equipment $1,090 $100 $1,090
12,896
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $578 - $578
6,741
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $293 $640 $293
3,517
kWh
- - -
06 2.2612: Use cooling tower water instead of refrigeration $16,579 $22,000 - - $16,579
-
Tgal
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,300 - - - - $1,300
-
lb
TOTAL RECOMMENDED $24,526 $27,781 $6,114
72,392
kWh
$533
-
MMBtu
$16,579
-
Tgal
$1,300
-
lb
TOTAL IMPLEMENTED $4,083 $4,041 $4,083
48,359
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs