Assessment Year | 2004 |
---|---|
Principal Product | Stampings and Welded Assemblies |
NAICS | 336370: Motor Vehicle Metal Stamping |
SIC | 3465: Automotive Stampings |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
119,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $133,062 | 2,537,175 |
kWh
|
$0.052 |
Electricity Demand | $27,304 | 6,595 |
kW-mo/yr
|
$4.14 |
Natural Gas | $80,364 | 11,080 |
MMBtu
|
$7.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,073 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,404 | $385 |
$13,721
261,611
kWh
|
$2,683
-
kW-mo/yr
|
- | |
02 | 2.7314: Reduce ventilation air | $11,361 | $500 | - | - |
$11,361
-
MMBtu
|
|
03 | 2.7135: Install occupancy sensors | $10,111 | $5,310 |
$10,111
192,779
kWh
|
- | - | |
04 | 2.7244: Revise smoke cleanup from operations | $9,084 | $4,000 | - | - |
$9,084
-
MMBtu
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,652 | $12,043 |
$2,997
57,135
kWh
|
$655
-
kW-mo/yr
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,461 | $1,000 |
$1,221
23,303
kWh
|
$240
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $52,073 | $23,238 |
$28,050
534,828
kWh
|
$3,578
-
kW-mo/yr
|
$20,445
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs