ITAC Assessment: UM0256
ITAC logo
ITAC Assessment: UM0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Stampings and Welded Assemblies
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 119,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $133,062 2,537,175
kWh
Electricity Demand $27,304 6,595
kW-mo/yr
Natural Gas $80,364 11,080
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,073 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,404 $385 $13,721
261,611
kWh
$2,683
-
kW-mo/yr
-
02 2.7314: Reduce ventilation air $11,361 $500 - - $11,361
-
MMBtu
03 2.7135: Install occupancy sensors $10,111 $5,310 $10,111
192,779
kWh
- -
04 2.7244: Revise smoke cleanup from operations $9,084 $4,000 - - $9,084
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,652 $12,043 $2,997
57,135
kWh
$655
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $1,461 $1,000 $1,221
23,303
kWh
$240
-
kW-mo/yr
-
TOTAL RECOMMENDED $52,073 $23,238 $28,050
534,828
kWh
$3,578
-
kW-mo/yr
$20,445
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings