ITAC Assessment: GT0915
ITAC logo
ITAC Assessment: GT0915
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Compressors
NAICS 333912: Air and Gas Compressor Manufacturing
SIC 3563: Air and Gas Compressors
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 106,000
ft2
Annual Production 8,261
units
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $333,532 5,376,432
kWh
Electricity Demand $25,563 1,977
kW-mo/yr
TOTAL YEARLY COSTS $359,095
RECOMMENDED SAVINGS* $47,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $2,293 $100 $2,293
36,986
kWh
02 2.6231: Utilize controls to operate equipment only when needed $3,909 $580 $3,909
63,056
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,057 $13,064 $4,057
65,434
kWh
04 2.9114: Use solar heat to make electricty $36,802 $531,855 $36,802
593,547
kWh
TOTAL RECOMMENDED $47,061 $545,599 $47,061
759,023
kWh
TOTAL IMPLEMENTED $10,259 $13,744 $10,259
165,476
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs