Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,572

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0069 #09 Y:1995 Replace gasoline with diesel, lpg, or natural gas $5,434 $7,200
NC0069 #08 Y:1995 Size electric motors for peak operating efficiency $6,888 $7,500
NC0069 #07 Y:1995 Replace electrically-operated equipment with fossil fuel equipment $20,681 $40,000
NC0069 #06 Y:1995 Insulate bare equipment $538 $864
NC0069 #05 Y:1995 Reduce ventilation air $782 $1,250
NC0069 #04 Y:1995 Use most efficient type of electric motors $192 $168
NC0069 #03 Y:1995 Utilize energy-efficient belts and other improved mechanisms $580 $588
NC0069 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $388 $300
NC0069 #01 Y:1995 Use adjustable frequency drive or multiple speed motors on existing system $21,000 $45,000
MO0153 #09 Y:1995 Replace city water with recycled water via cooling tower $61,537 $5,000
MO0153 #08 Y:1995 Install compressor air intakes in coolest locations $4,192 $702
MO0153 #07 Y:1995 Utilize higher efficiency lamps and/or ballasts $193 $276
MO0153 #06 Y:1995 Utilize higher efficiency lamps and/or ballasts $5,648 $3,010
MO0153 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $2,743 $1,063
MO0153 #04 Y:1995 Use most efficient type of electric motors $2,849 $7,562
MO0153 #03 Y:1995 Utilize energy-efficient belts and other improved mechanisms $540 $365
MO0153 #02 Y:1995 Purchase gas directly from a contract gas supplier $26,406 $300
MO0153 #01 Y:1995 Analyze flue gas for proper air/fuel ratio $2,220 $995
WV0065 #09 Y:1995 Optimize plant power factor $2,515 $5,545
WV0065 #08 Y:1995 Install turbulators $1,291 $1,040