| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0069 #09 Y:1995 | 09 | 1995 | Replace gasoline with diesel, lpg, or natural gas | $5,434 | $7,200 | |
| NC0069 #08 Y:1995 | 08 | 1995 | Size electric motors for peak operating efficiency | $6,888 | $7,500 | |
| NC0069 #07 Y:1995 | 07 | 1995 | Replace electrically-operated equipment with fossil fuel equipment | $20,681 | $40,000 | |
| NC0069 #06 Y:1995 | 06 | 1995 | Insulate bare equipment | $538 | $864 | |
| NC0069 #05 Y:1995 | 05 | 1995 | Reduce ventilation air | $782 | $1,250 | |
| NC0069 #04 Y:1995 | 04 | 1995 | Use most efficient type of electric motors | $192 | $168 | |
| NC0069 #03 Y:1995 | 03 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $580 | $588 | |
| NC0069 #02 Y:1995 | 02 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $388 | $300 | |
| NC0069 #01 Y:1995 | 01 | 1995 | Use adjustable frequency drive or multiple speed motors on existing system | $21,000 | $45,000 | |
| MO0153 #09 Y:1995 | 09 | 1995 | Replace city water with recycled water via cooling tower | $61,537 | $5,000 | |
| MO0153 #08 Y:1995 | 08 | 1995 | Install compressor air intakes in coolest locations | $4,192 | $702 | |
| MO0153 #07 Y:1995 | 07 | 1995 | Utilize higher efficiency lamps and/or ballasts | $193 | $276 | |
| MO0153 #06 Y:1995 | 06 | 1995 | Utilize higher efficiency lamps and/or ballasts | $5,648 | $3,010 | |
| MO0153 #05 Y:1995 | 05 | 1995 | Utilize higher efficiency lamps and/or ballasts | $2,743 | $1,063 | |
| MO0153 #04 Y:1995 | 04 | 1995 | Use most efficient type of electric motors | $2,849 | $7,562 | |
| MO0153 #03 Y:1995 | 03 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $540 | $365 | |
| MO0153 #02 Y:1995 | 02 | 1995 | Purchase gas directly from a contract gas supplier | $26,406 | $300 | |
| MO0153 #01 Y:1995 | 01 | 1995 | Analyze flue gas for proper air/fuel ratio | $2,220 | $995 | |
| WV0065 #09 Y:1995 | 09 | 1995 | Optimize plant power factor | $2,515 | $5,545 | |
| WV0065 #08 Y:1995 | 08 | 1995 | Install turbulators | $1,291 | $1,040 |