Assessment Year | 1996 |
---|---|
Principal Product | Medical and Surgical Devices |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
100,000
ft2
|
Annual Production | 3,000
units
|
Production Hrs. Annual | 4,675
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $230,811 | 4,550,410 |
kWh
|
$0.051 |
Electricity Demand | $84,043 | 10,755 |
kW-mo/yr
|
$7.81 |
Electricity Fees | $2,239 | - |
|
- |
Natural Gas | $12,447 | 2,637 |
MMBtu
|
$4.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,314 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,075 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $35,546 | $60,000 |
$16,388
531,946
kWh
|
$29,868
-
kW-mo/yr
|
- |
$(-10,710.0)
-
MMBtu
|
- | |
02 | 2.8121: Apply for tax-free status for energy purchases | $10,889 | - | - | - | $10,889 | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,667 | $8,000 |
$3,405
110,492
kWh
|
$3,490
-
kW-mo/yr
|
- |
$(-2,228.0)
-
MMBtu
|
- | |
04 | 2.7251: Reduce air conditioning load by evaporating water from roof | $6,626 | $27,600 |
$5,179
168,230
kWh
|
$4,309
-
kW-mo/yr
|
- | - |
$(-2,862.0)
-
Tgal
|
|
05 | 3.3122: Use filtration, centrifuging to remove contaminants | $3,490 | $6,500 | - | - | - | - |
$3,490
-
Tgal
|
|
06 | 2.7261: Install timers and/or thermostats | $2,039 | $6,400 | - | - | - |
$2,039
-
MMBtu
|
- | |
07 | 3.4115: Recover and reuse cooling water | $1,750 | $6,000 | - | - | - | - |
$1,750
-
Tgal
|
|
08 | 2.2621: Modify refrigeration system to operate at a lower pressure | $954 | $4,000 |
$462
14,947
kWh
|
$492
-
kW-mo/yr
|
- | - | - | |
09 | 2.6218: Turn off equipment when not in use | $1,135 | - |
$1,135
50,410
kWh
|
- | - | - | - | |
10 | 2.3134: Shift from daytime to nighttime operation | $718 | - | - |
$718
-
kW-mo/yr
|
- | - | - | |
11 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $500 | $2,000 |
$270
8,792
kWh
|
$230
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $68,314 | $120,500 |
$26,839
884,817
kWh
|
$39,107
-
kW-mo/yr
|
$10,889 |
$(-10,899.0)
-
MMBtu
|
$2,378
-
Tgal
|
||
TOTAL IMPLEMENTED | $41,075 | $72,900 |
$16,388
531,946
kWh
|
$29,868
-
kW-mo/yr
|
- |
$(-8,671.0)
-
MMBtu
|
$3,490
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings |