Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,581

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0667 #14 Y:2024 Utilize energy-efficient belts and other improved mechanisms $328 $1,530
WV0667 #13 Y:2024 Eliminate or reduce compressed air usage $678 $1,484
WV0667 #12 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $874 $1,127
WV0667 #11 Y:2024 Develop a repair/replace policy $1,520 $7,198
WV0667 #10 Y:2024 Install outside air damper / economizer on hvac unit $1,648 $8,028
WV0667 #09 Y:2024 Insulate bare equipment $2,181 $2,720
WV0667 #08 Y:2024 Recover heat from exhausted steam, hot air or hot water $2,409 $5,810
WV0667 #07 Y:2024 Upgrade controls on compressors $2,850 $10,551
WV0667 #06 Y:2024 Install compressor air intakes in coolest locations $3,123 $7,270
WV0667 #05 Y:2024 Preheat combustion air with waste heat $4,235 $20,025
WV0667 #04 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $4,396 $18,935
WV0667 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,599 $13,481
WV0667 #02 Y:2024 Install turbulators $6,784 $4,404
WV0667 #01 Y:2024 Analyze flue gas for proper air/fuel ratio $8,417 $2,917
MI0446 #03 Y:2024 Establish a preventative maintenance program $15,109 $12,480
MI0446 #02 Y:2024 Upgrade conveyors $36,000 $40,966
MI0446 #01 Y:2024 Use or replace with energy efficient substitutes $103,738 $390,000
TR0058 #04 Y:2024 Meter waste water $408 $1,511
TR0058 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $727 $2,781
TR0058 #02 Y:2024 Replace existing hvac unit with high efficiency model $2,706 $7,350