Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0338 #09 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $5,570 $19,032
IC0338 #08 Y:2025 Eliminate or reduce compressed air usage $833 $576
IC0338 #07 Y:2025 Insulate bare equipment $34,779 $59,600
IC0338 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,751 $2,378
IC0338 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,505 $3,178
IC0338 #04 Y:2025 Install occupancy sensors $4,703 $7,750
IC0338 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $812 $1,669
IC0338 #02 Y:2025 Lower temperature during the winter season and vice-versa $1,183 -
IC0338 #01 Y:2025 Add equipment/ operators to reduce production bottleneck $149,644 $500,000
BD0349 #08 Y:2008 Minimize water usage $991 $2,300
BD0349 #07 Y:2008 Replace obsolete burners with more efficient ones $128,022 $46,000
BD0349 #06 Y:2008 Install turbulators $131,143 $8,000
BD0349 #05 Y:2008 Direct warmest air to combustion intake $87,545 $10,000
BD0349 #04 Y:2008 Replace boiler $205,005 $110,000
BD0349 #03 Y:2008 Reduce the pressure of compressed air to the minimum required $3,618 -
BD0349 #02 Y:2008 Use most efficient type of electric motors $38,551 $96,150
BD0349 #01 Y:2008 Install occupancy sensors $8,788 $1,125
IC0054 #06 Y:2002 Utilize higher efficiency lamps and/or ballasts $6,988 $19,296
IC0054 #05 Y:2002 Install compressor air intakes in coolest locations $192 $150
IC0054 #04 Y:2002 Install occupancy sensors $808 $2,002