Assessment Year | 2008 |
---|---|
Principal Product | EPDM Sheeting, Adhesive Accessories |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 261 |
Plant Area |
200,000
ft2
|
Annual Production | 250,000
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,387,708 | 26,432,538 |
kWh
|
$0.052 |
Electricity Demand | $80,246 | 56,352 |
kW-mo/yr
|
$1.42 |
Natural Gas | $483,331 | 62,785 |
MMBtu
|
$7.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $603,663 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,788 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $8,788 | $1,125 |
$8,391
159,831
kWh
|
$397
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $38,551 | $96,150 |
$37,030
705,342
kWh
|
$1,521
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,618 | - |
$3,452
65,760
kWh
|
$166
-
kW-mo/yr
|
- | - | |
04 | 2.1224: Replace boiler | $205,005 | $110,000 | - | - |
$205,005
-
MMBtu
|
- | |
05 | 2.1213: Direct warmest air to combustion intake | $87,545 | $10,000 | - | - |
$87,545
-
MMBtu
|
- | |
06 | 2.1222: Install turbulators | $131,143 | $8,000 | - | - |
$131,143
-
MMBtu
|
- | |
07 | 2.1221: Replace obsolete burners with more efficient ones | $128,022 | $46,000 | - | - |
$128,022
-
MMBtu
|
- | |
08 | 3.4151: Minimize water usage | $991 | $2,300 | - | - | - |
$991
-
gal
|
|
TOTAL RECOMMENDED | $603,663 | $273,575 |
$48,873
930,933
kWh
|
$2,084
-
kW-mo/yr
|
$551,715
-
MMBtu
|
$991
-
gal
|
||
TOTAL IMPLEMENTED | $8,788 | $1,125 |
$8,391
159,831
kWh
|
$397
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs