Assessment Year | 2003 |
---|---|
Principal Product | Cast Polyurethane Parts |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 75 |
Plant Area |
50,000
ft2
|
Annual Production | 400,000
lb
|
Production Hrs. Annual | 5,464
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $38,934 | 1,106,640 |
kWh
|
$0.035 |
Electricity Demand | $31,775 | 2,596 |
kW-mo/yr
|
$12.24 |
Electricity Fees | $4,641 | - |
|
- |
Natural Gas | $62,838 | 9,585 |
MMBtu
|
$6.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,705 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $358 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $358 | $1,074 |
$205
5,707
kWh
|
$153
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,888 | $7,452 |
$1,264
35,112
kWh
|
$942
-
kW-mo/yr
|
$(-266.0) | $(-52.0) | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,471 | $1,000 |
$839
23,355
kWh
|
$632
-
kW-mo/yr
|
- | - | |
04 | 2.7135: Install occupancy sensors | $808 | $2,002 |
$428
11,884
kWh
|
$380
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $192 | $150 |
$76
2,114
kWh
|
$116
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,988 | $19,296 |
$3,175
88,173
kWh
|
$2,371
-
kW-mo/yr
|
$142 | $1,300 | |
TOTAL RECOMMENDED | $11,705 | $30,974 |
$5,987
166,345
kWh
|
$4,594
-
kW-mo/yr
|
$(-124.0) | $1,248 | ||
TOTAL IMPLEMENTED | $358 | $1,074 |
$205
5,707
kWh
|
$153
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs