ITAC Assessment: SD0052
ITAC logo
ITAC Assessment: SD0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product INDUSTRIAL LUBRICANTS
NAICS
n/a
SIC 2992: Lubricating Oils and Greases
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area
n/a
Annual Production 5,500
Tgal
Production Hrs. Annual 2,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,173 1,353,458
kWh
Natural Gas $79,094 22,258
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,390 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,594

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $165 $222 $165
1,172
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,255 $4,329 $4,255
33,998
kWh
- -
03 2.1131: Repair faulty insulation in furnaces, boilers, etc $312 $658 - $312
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $1,571 $654 - $1,571
-
MMBtu
-
05 2.1242: Minimize boiler blowdown with better feedwater treatment $9,280 $2,450 - $9,280
-
MMBtu
-
06 2.2113: Repair or replace steam traps $14,542 $6,550 - $14,542
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,035 $40 $3,035
24,033
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $434 - $485
3,810
kWh
- $(-51.0)
09 2.7144: Install spectral reflectors / delamp $2,893 $3,900 $2,563
20,516
kWh
- $330
10 2.6232: Install set-back timers $903 $1,240 $759
6,155
kWh
- $144
TOTAL RECOMMENDED $37,390 $20,043 $11,262
89,684
kWh
$25,705
-
MMBtu
$423
TOTAL IMPLEMENTED $33,594 $14,903 $7,940
63,013
kWh
$25,705
-
MMBtu
$(-51.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs