1,581
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Fabricated rubber products, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IC0338 #09 Y:2025 | 09 | 2025 | Use waste heat from hot flue gases to preheat incoming fluids | $5,570 | $19,032 |
n/a
|
| IC0338 #08 Y:2025 | 08 | 2025 | Eliminate or reduce compressed air usage | $833 | $576 |
n/a
|
| IC0338 #07 Y:2025 | 07 | 2025 | Insulate bare equipment | $34,779 | $59,600 |
n/a
|
| IC0338 #06 Y:2025 | 06 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,751 | $2,378 |
n/a
|
| IC0338 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,505 | $3,178 |
n/a
|
| IC0338 #04 Y:2025 | 04 | 2025 | Install occupancy sensors | $4,703 | $7,750 |
n/a
|
| IC0338 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $812 | $1,669 |
n/a
|
| IC0338 #02 Y:2025 | 02 | 2025 | Lower temperature during the winter season and vice-versa | $1,183 | - |
n/a
|
| IC0338 #01 Y:2025 | 01 | 2025 | Add equipment/ operators to reduce production bottleneck | $1,219,168 | $500,000 |
n/a
|
| UL2501 #09 Y:2025 | 09 | 2025 | Lower ceiling to reduce conditioned space | $38,672 | $8,000 |
n/a
|
| UL2501 #08 Y:2025 | 08 | 2025 | Use solar heat to make electricty | $95,468 | $929,060 |
n/a
|
| UL2501 #07 Y:2025 | 07 | 2025 | Optimize plant power factor | $25,794 | $14,820 |
n/a
|
| UL2501 #06 Y:2025 | 06 | 2025 | Use outside cold water source as a supply of cooling water | $141,151 | $58,367 |
n/a
|
| UL2501 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $1,240 | $2,661 |
n/a
|
| UL2501 #04 Y:2025 | 04 | 2025 | Reduce illumination to minimum necessary levels | $592 | - |
n/a
|
| UL2501 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,347 | $574 |
n/a
|
| UL2501 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,462 | $1,440 |
n/a
|
| UL2501 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $5,472 | - |
n/a
|
| WM0240 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,748 | - |
n/a
|
| WM0240 #04 Y:2025 | 04 | 2025 | Reduce space conditioning during non-working hours | $1,825 | - |
n/a
|