| Assessment Year | 2026 |
|---|---|
| Principal Product | Orthotic insoles, Footcare |
| NAICS | 326299: All Other Rubber Product Manufacturing |
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 162 |
| Plant Area |
194,000
ft2
|
| Annual Production | 41,560,522
units
|
| Production Hrs. Annual | 2,800
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $182,597 | 2,298,298 |
kWh
|
$0.079 | |
| Electricity Demand | $49,924 | 7,528 |
kW-mo/yr
|
$6.63 | |
| Electricity Fees | $936 | - |
|
- | |
| Natural Gas | $64,389 | 7,355 |
MMBtu
|
$8.75 | |
| Waste Disposal Costs | |||||
| Water Usage | $3,238 | 407 |
Tgal
|
$7.96 | |
| Water Disposal | $1,712 | 407 |
Tgal
|
$4.21 | |
| Other Liquid (non-haz) | $3,325 | 1 |
gal
|
$3,325.00 | |
| TOTAL YEARLY COSTS | $306,121 | ||||
| RECOMMENDED SAVINGS* | $44,782 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $19,954 | $1,083 |
$9,079
114,342
kWh
|
- |
$10,875
-
MMBtu
|
|
| 02 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $14,756 | $2,245 | - | - |
$14,756
-
MMBtu
|
|
| 03 | 2.7241: Install outside air damper / economizer on hvac unit | $1,533 | $696 |
$1,533
20,016
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,255 | $927 |
$3,870
48,739
kWh
|
$1,385
-
kW-mo/yr
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $3,284 | $6,633 |
$3,284
42,872
kWh
|
- | - | |
| TOTAL RECOMMENDED | $44,782 | $11,584 |
$17,766
225,969
kWh
|
$1,385
-
kW-mo/yr
|
$25,631
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs