ITAC Assessment: UD1137
ITAC logo
ITAC Assessment: UD1137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Orthotic insoles, Footcare
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 162
Plant Area 194,000
ft2
Annual Production 41,560,522
units
Production Hrs. Annual 2,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,597 2,298,298
kWh
Electricity Demand $49,924 7,528
kW-mo/yr
Electricity Fees $936 -
Natural Gas $64,389 7,355
MMBtu
Waste Disposal Costs
Water Usage $3,238 407
Tgal
Water Disposal $1,712 407
Tgal
Other Liquid (non-haz) $3,325 1
gal
TOTAL YEARLY COSTS $306,121
RECOMMENDED SAVINGS* $44,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $19,954 $1,083 $9,079
114,342
kWh
- $10,875
-
MMBtu
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $14,756 $2,245 - - $14,756
-
MMBtu
03 2.7241: Install outside air damper / economizer on hvac unit $1,533 $696 $1,533
20,016
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,255 $927 $3,870
48,739
kWh
$1,385
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $3,284 $6,633 $3,284
42,872
kWh
- -
TOTAL RECOMMENDED $44,782 $11,584 $17,766
225,969
kWh
$1,385
-
kW-mo/yr
$25,631
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs