Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

87

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Molded, extruded, and lathe-cut mechanical rubber goods
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1097 #09 Y:2024 Utilize energy-efficient belts and other improved mechanisms $4,544 -
UD1097 #08 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,220 $14,406
UD1097 #07 Y:2024 Eliminate or reduce compressed air usage $296 -
UD1097 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $400 $900
UD1097 #05 Y:2024 Install compressor air intakes in coolest locations $471 $320
UD1097 #04 Y:2024 Turn off equipment during breaks, reduce operating time $1,568 -
UD1097 #03 Y:2024 Minimize water usage $1,616 -
UD1097 #02 Y:2024 Use flow control valves on equipment to optimize water use $2,598 $104
UD1097 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $63,287 -
UD1069 #08 Y:2023 Cover open tanks $42 $2,000
UD1069 #07 Y:2023 Use closed cycle process to minimize waste water production $51,914 $75,982
UD1069 #06 Y:2023 Install occupancy sensors $1,372 $1,389
UD1069 #05 Y:2023 Upgrade controls on compressors $1,799 -
UD1069 #04 Y:2023 Eliminate or reduce compressed air usage $2,894 $1,403
UD1069 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $4,461 $952
UD1069 #02 Y:2023 Utilize energy-efficient belts and other improved mechanisms $3,796 $300
UD1069 #01 Y:2023 Turn off equipment during breaks, reduce operating time $31,978 -
UD1013 #10 Y:2019 Replace city water with recycled water via cooling tower $5,681 $21,000
UD1013 #09 Y:2019 Utilize daylight whenever possible in lieu of artificial light $1,053 $1,800
UD1013 #08 Y:2019 Utilize higher efficiency lamps and/or ballasts $12,239 $14,500