87
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Molded, extruded, and lathe-cut mechanical rubber goods | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1097 #09 Y:2024 | 09 | 2024 | Utilize energy-efficient belts and other improved mechanisms | $4,544 | - | |
| UD1097 #08 Y:2024 | 08 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $9,220 | $14,406 | |
| UD1097 #07 Y:2024 | 07 | 2024 | Eliminate or reduce compressed air usage | $296 | - | |
| UD1097 #06 Y:2024 | 06 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $400 | $900 | |
| UD1097 #05 Y:2024 | 05 | 2024 | Install compressor air intakes in coolest locations | $471 | $320 | |
| UD1097 #04 Y:2024 | 04 | 2024 | Turn off equipment during breaks, reduce operating time | $1,568 | - | |
| UD1097 #03 Y:2024 | 03 | 2024 | Minimize water usage | $1,616 | - | |
| UD1097 #02 Y:2024 | 02 | 2024 | Use flow control valves on equipment to optimize water use | $2,598 | $104 | |
| UD1097 #01 Y:2024 | 01 | 2024 | Reschedule plant operations or reduce load to avoid peaks | $63,287 | - | |
| UD1069 #08 Y:2023 | 08 | 2023 | Cover open tanks | $42 | $2,000 | |
| UD1069 #07 Y:2023 | 07 | 2023 | Use closed cycle process to minimize waste water production | $51,914 | $75,982 | |
| UD1069 #06 Y:2023 | 06 | 2023 | Install occupancy sensors | $1,372 | $1,389 | |
| UD1069 #05 Y:2023 | 05 | 2023 | Upgrade controls on compressors | $1,799 | - | |
| UD1069 #04 Y:2023 | 04 | 2023 | Eliminate or reduce compressed air usage | $2,894 | $1,403 | |
| UD1069 #03 Y:2023 | 03 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,461 | $952 | |
| UD1069 #02 Y:2023 | 02 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $3,796 | $300 | |
| UD1069 #01 Y:2023 | 01 | 2023 | Turn off equipment during breaks, reduce operating time | $31,978 | - | |
| UD1013 #10 Y:2019 | 10 | 2019 | Replace city water with recycled water via cooling tower | $5,681 | $21,000 | |
| UD1013 #09 Y:2019 | 09 | 2019 | Utilize daylight whenever possible in lieu of artificial light | $1,053 | $1,800 | |
| UD1013 #08 Y:2019 | 08 | 2019 | Utilize higher efficiency lamps and/or ballasts | $12,239 | $14,500 |