ITAC Assessment: MZ0384
ITAC logo
ITAC Assessment: MZ0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product automotive mechanical rubber goods
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 125,000
ft2
Annual Production 123,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $424,924 5,202,600
kWh
Electricity Demand $210,947 34,345
kW-mo/yr
Natural Gas $69,978 19,276
MMBtu
Waste Disposal Costs
Water Usage $13,519 311
Tgal
TOTAL YEARLY COSTS $719,368
RECOMMENDED SAVINGS* $218,078 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $147,022 $916,500 $115,396
1,407,265
kWh
$31,626
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,640 $720 $1,842
22,468
kWh
$798
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $13,783 $38,375 $13,783
168,918
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,960 $48,233 $27,960
343,761
kWh
- -
05 2.3212: Optimize plant power factor $25,773 $57,874 - $25,773
-
kW-mo/yr
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $900 $600 - - $900
-
MMBtu
TOTAL RECOMMENDED $218,078 $1,062,302 $158,981
1,942,412
kWh
$58,197
-
kW-mo/yr
$900
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs