Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

447

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rubber and plastics hose and belting
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0027 #05 Y:2024 Clean or color roof to reduce solar load $4,408 $3,040
NT0027 #04 Y:2024 Optimize plant power factor $2,533 $1,946
NT0027 #03 Y:2024 Lower temperature during the winter season and vice-versa $5,335 -
NT0027 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $4,456 $5,609
NT0027 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $5,267 $5,347
OK1077 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $7,559 $9,108
OK1077 #04 Y:2022 Install outside air damper / economizer on hvac unit $2,586 $7,371
OK1077 #03 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $530 $347
OK1077 #02 Y:2022 Use solar heat to make electricty $24,215 $230,880
OK1077 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $3,255 $7,590
GT0950 #08 Y:2020 Replace existing hvac unit with high efficiency model $3,956 $38,500
GT0950 #07 Y:2020 Use solar heat to make electricty $97,184 $1,413,929
GT0950 #06 Y:2020 Optimize plant power factor $1,358 $5,106
GT0950 #05 Y:2020 Utilize energy-efficient belts and other improved mechanisms $337 $401
GT0950 #04 Y:2020 Utilize higher efficiency lamps and/or ballasts $43,586 $47,656
GT0950 #03 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $5,557 $4,500
GT0950 #02 Y:2020 Chill water to the highest temperature possible $1,114 $400
GT0950 #01 Y:2020 Install timers and/or thermostats $1,607 $225
NL0048 #06 Y:2020 Recover and reuse waste material $664 $3,180
NL0048 #05 Y:2020 Reschedule plant operations or reduce load to avoid peaks $5,824 $50