Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

36

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rubber and plastics hose and belting
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0723 #15 Y:2005 Upgrade controls on compressors $522 -
UD0723 #14 Y:2005 Use / purchase optimum sized compressor $840 -
UD0723 #13 Y:2005 Size electric motors for peak operating efficiency $1,423 $500
UD0723 #12 Y:2005 Reduce the pressure of compressed air to the minimum required $2,164 -
UD0723 #11 Y:2005 Insulate bare equipment $2,650 $2,629
UD0723 #10 Y:2005 Use properly designed and sized hvac equipment $2,730 -
UD0723 #09 Y:2005 Reduce water use with counter current rinsing $3,070 $2,000
UD0723 #08 Y:2005 Analyze flue gas for proper air/fuel ratio $4,309 -
UD0723 #07 Y:2005 Repair faulty insulation in furnaces, boilers, etc $4,573 -
UD0723 #06 Y:2005 Reschedule plant operations or reduce load to avoid peaks $5,470 -
UD0723 #05 Y:2005 Install outside air damper / economizer on hvac unit $6,126 $7,000
UD0723 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $6,315 $13,340
UD0723 #03 Y:2005 Use waste heat from hot flue gases to preheat $7,394 -
UD0723 #02 Y:2005 Reduce illumination to minimum necessary levels $7,430 -
UD0723 #01 Y:2005 Utilize higher efficiency lamps and/or ballasts $24,840 $65,105
UD0619 #08 Y:2001 Utilize higher efficiency lamps and/or ballasts $940 $2,256
UD0619 #07 Y:2001 Make a practice of turning off lights when not needed $1,873 $2,400
UD0619 #06 Y:2001 Use most efficient type of electric motors $2,846 $5,628
UD0619 #05 Y:2001 Install / repair insulation on steam lines $6,322 $940
UD0619 #04 Y:2001 Recover and reuse waste material $5,700 -