ITAC Assessment: OK1077
ITAC logo
ITAC Assessment: OK1077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Stamped gaskets, fabricated parts, and hoses
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 42,100
ft2
Annual Production 55,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,115 488,941
kWh
Electricity Demand $9,072 1,586
kW-mo/yr
Electricity Fees $552 -
Natural Gas $36,464 3,942
MMBtu
Waste Disposal Costs
Water Usage $2,142 451
Tgal
TOTAL YEARLY COSTS $87,345
RECOMMENDED SAVINGS* $38,145 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,255 $7,590 $2,734
34,169
kWh
$521
-
kW-mo/yr
02 2.9114: Use solar heat to make electricty $24,215 $230,880 $24,026
300,321
kWh
$189
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $530 $347 $530
6,629
kWh
-
04 2.7241: Install outside air damper / economizer on hvac unit $2,586 $7,371 $2,586
32,323
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,559 $9,108 $7,559
94,488
kWh
-
TOTAL RECOMMENDED $38,145 $255,296 $37,435
467,930
kWh
$710
-
kW-mo/yr
TOTAL IMPLEMENTED $530 $347 $530
6,629
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs