Assessment Year | 2025 |
---|---|
Principal Product | Hydraulic Hose |
NAICS | 326220: Rubber and Plastics Hoses and Belting Manufacturing |
SIC | 3052: Rubber and Plastics Hose and Belting |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
184,937
ft2
|
Annual Production | 3,999
thousand feet
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $702,799 | 6,159,927 |
kWh
|
$0.11 | |
Natural Gas | $153,012 | 11,571 |
MMBtu
|
$13.22 | |
Waste Disposal Costs | |||||
Water Usage | $247,042 | 113,636 |
Tgal
|
$2.17 | |
Water Disposal | $11,418 | 16,168 |
Tgal
|
$0.71 | |
TOTAL YEARLY COSTS | $1,114,271 | ||||
RECOMMENDED SAVINGS* | $620,817 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $508,143 | $2,436,747 |
$508,143
4,453,489
kWh
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $30,472 | $17,136 |
$30,472
267,067
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $25,346 | $1,500 |
$25,346
222,144
kWh
|
- | - | - | - | |
04 | 2.6218: Turn off equipment when not in use | $19,725 | $12,000 |
$19,725
172,878
kWh
|
- | - | - | - | |
05 | 2.2441: Preheat boiler makeup water with waste process heat | $11,614 | $38,380 | - |
$11,614
-
MMBtu
|
- | - | - | |
06 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $10,702 | $50,000 | - |
$7,187
-
MMBtu
|
$1,567
-
Tgal
|
$508
-
Tgal
|
$1,440 | |
07 | 3.4111: Use closed cycle process to minimize waste water production | $6,469 | $25,000 | - | - |
$4,883
-
Tgal
|
$1,586
-
Tgal
|
- | |
08 | 2.4239: Eliminate or reduce compressed air usage | $3,319 | $3,400 |
$3,319
29,086
kWh
|
- | - | - | - | |
09 | 2.2441: Preheat boiler makeup water with waste process heat | $2,928 | $11,800 | - |
$2,928
-
MMBtu
|
- | - | - | |
10 | 2.2121: Increase amount of condensate returned | $928 | $5,000 | - |
$899
-
MMBtu
|
$22
-
Tgal
|
$7
-
Tgal
|
- | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $642 | $1,400 |
$642
5,623
kWh
|
- | - | - | - | |
12 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $529 | $1,344 | - |
$529
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $620,817 | $2,603,707 |
$587,647
5,150,287
kWh
|
$23,157
-
MMBtu
|
$6,472
-
Tgal
|
$2,101
-
Tgal
|
$1,440 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs