ITAC Assessment: TT0330
ITAC logo
ITAC Assessment: TT0330
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Hydraulic Hose
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 184,937
ft2
Annual Production 3,999
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $702,799 6,159,927
kWh
Natural Gas $153,012 11,571
MMBtu
Waste Disposal Costs
Water Usage $247,042 113,636
Tgal
Water Disposal $11,418 16,168
Tgal
TOTAL YEARLY COSTS $1,114,271
RECOMMENDED SAVINGS* $620,817 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $508,143 $2,436,747 $508,143
4,453,489
kWh
- - - -
02 2.7135: Install occupancy sensors $30,472 $17,136 $30,472
267,067
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,346 $1,500 $25,346
222,144
kWh
- - - -
04 2.6218: Turn off equipment when not in use $19,725 $12,000 $19,725
172,878
kWh
- - - -
05 2.2441: Preheat boiler makeup water with waste process heat $11,614 $38,380 - $11,614
-
MMBtu
- - -
06 2.2449: Recover heat from exhausted steam, hot air or hot water $10,702 $50,000 - $7,187
-
MMBtu
$1,567
-
Tgal
$508
-
Tgal
$1,440
07 3.4111: Use closed cycle process to minimize waste water production $6,469 $25,000 - - $4,883
-
Tgal
$1,586
-
Tgal
-
08 2.4239: Eliminate or reduce compressed air usage $3,319 $3,400 $3,319
29,086
kWh
- - - -
09 2.2441: Preheat boiler makeup water with waste process heat $2,928 $11,800 - $2,928
-
MMBtu
- - -
10 2.2121: Increase amount of condensate returned $928 $5,000 - $899
-
MMBtu
$22
-
Tgal
$7
-
Tgal
-
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $642 $1,400 $642
5,623
kWh
- - - -
12 2.1135: Repair furnaces and oven doors so that they seal efficiently $529 $1,344 - $529
-
MMBtu
- - -
TOTAL RECOMMENDED $620,817 $2,603,707 $587,647
5,150,287
kWh
$23,157
-
MMBtu
$6,472
-
Tgal
$2,101
-
Tgal
$1,440
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs