ITAC Assessment: UD0237
ITAC logo
ITAC Assessment: UD0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product FLUOROPOLYMER PRODUCTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,200
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,740 5,063,892
kWh
Natural Gas $89,880 18,581
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $2,394 $200 $2,394
102,872
kWh
- -
02 2.2444: Use hot process fluids to preheat incoming process fluids $1,466 $3,000 - $1,466
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,505 $1,790 $3,176
75,615
kWh
- $329
04 2.4133: Use most efficient type of electric motors $697 $2,000 $697
15,826
kWh
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $12,129 - $12,129
-
kWh
- -
06 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $5,305 $67 $472
20,223
kWh
$4,833
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,948 $4,140 $1,770
42,204
kWh
$12,178
-
MMBtu
-
08 3.4151: Minimize water usage $3,986 $2,000 - - $3,986
09 3.4115: Recover and reuse cooling water $2,400 $4,000 $(-369.0)
(-7,327)
kWh
- $2,769
TOTAL RECOMMENDED $45,830 $17,197 $20,269
249,413
kWh
$18,477
-
MMBtu
$7,084
TOTAL IMPLEMENTED $45,830 $17,197 $20,269
249,413
kWh
$18,477
-
MMBtu
$7,084
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs