Assessment Year | 2010 |
---|---|
Principal Product | Carbonated/Non-carbonated Beverage |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
125,000
ft2
|
Annual Production | 30,000,000
pieces
|
Production Hrs. Annual | 7,054
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $465,000 | 7,472,000 |
kWh
|
$0.062 |
Electricity Demand | $20,600 | 1,446 |
kW-mo/yr
|
$14.25 |
Natural Gas | $285,900 | 45,916 |
MMBtu
|
$6.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $335,792 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $116,137 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $31,870 | $13,000 | - | - |
$31,870
-
MMBtu
|
|
02 | 2.1224: Replace boiler | $59,500 | $102,000 | - | - |
$59,500
-
MMBtu
|
|
03 | 2.1212: Operate boilers on high fire setting | $35,000 | $50 | - | - |
$35,000
-
MMBtu
|
|
04 | 3.4159: Replace treated water with well / surface water | $39,150 | $100,000 |
$35,150
708,540
kWh
|
$4,000
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $82,808 | $125,000 |
$65,681
706,250
kWh
|
$17,127
-
kW-mo/yr
|
- | |
06 | 2.7245: Use direct air supply to exhaust hoods | $9,000 | $3,000 | - | - |
$9,000
-
MMBtu
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,600 | $1,200 |
$7,083
284,000
kWh
|
$5,517
-
kW-mo/yr
|
- | |
08 | 2.7314: Reduce ventilation air | $21,000 | $15,000 | - | - |
$21,000
-
MMBtu
|
|
09 | 2.7313: Recycle air for heating, ventilation and air conditioning | $23,200 | $15,000 | - | - |
$23,200
-
MMBtu
|
|
10 | 2.6125: Keep equipment clean | $3,631 | $500 | - | - |
$3,631
-
MMBtu
|
|
11 | 2.7233: Use properly designed and sized hvac equipment | $3,631 | $1,830 | - | - |
$3,631
-
MMBtu
|
|
12 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,467 | $6,000 |
$3,543
38,092
kWh
|
$924
-
kW-mo/yr
|
- | |
13 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,935 | $2,840 |
$7,882
84,750
kWh
|
$2,053
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $335,792 | $385,420 |
$119,339
1,821,632
kWh
|
$29,621
-
kW-mo/yr
|
$186,832
-
MMBtu
|
||
TOTAL IMPLEMENTED | $116,137 | $137,530 |
$76,307
1,028,342
kWh
|
$23,568
-
kW-mo/yr
|
$16,262
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs