ITAC Assessment: NT0027
ITAC logo
ITAC Assessment: NT0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Extruded Plastic Tube Products
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $10
M
to 50
M
# of Employees 101
Plant Area 76,000
ft2
Annual Production 4,200
thousand feet
Production Hrs. Annual 6,864
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,358 2,904,883
kWh
Electricity Demand $78,313 4,695
kW-mo/yr
Electricity Fees $9,547 -
Natural Gas $3,453 270
MMBtu
Waste Disposal Costs
Water Usage $41,108 4,510
Tgal
TOTAL YEARLY COSTS $393,778
RECOMMENDED SAVINGS* $22,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,267 $5,347 $3,978
44,201
kWh
$1,289
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,456 $5,609 $3,365
37,393
kWh
$1,091
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $5,335 - $5,335
59,281
kWh
-
04 2.3212: Optimize plant power factor $2,533 $1,946 - $2,533
-
kW-mo/yr
05 2.7425: Clean or color roof to reduce solar load $4,408 $3,040 $2,128
23,644
kWh
$2,280
-
kW-mo/yr
TOTAL RECOMMENDED $22,000 $15,942 $14,807
164,519
kWh
$7,193
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs