ITAC Assessment: UD0401
ITAC logo
ITAC Assessment: UD0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product polymers and water-based adhesives
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 80
Plant Area 80,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 8,500
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,567 4,082,356
kWh
Natural Gas $115,182 38,397
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,839 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,652

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,367 - $5,367
-
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,994 $300 - $1,994
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $3,714 $10,139 - $3,714
-
MMBtu
04 2.2426: Use waste heat from flue gases to heat space conditioning air $6,173 $18,000 - $6,173
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $647 - $647
13,775
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,944 $10,376 $4,360
88,218
kWh
$(-416.0)
-
MMBtu
TOTAL RECOMMENDED $21,839 $38,815 $10,374
101,993
kWh
$11,465
-
MMBtu
TOTAL IMPLEMENTED $9,652 $20,815 $4,360
88,218
kWh
$5,292
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs