Assessment Year | 2023 |
---|---|
Principal Product | Pet and Animal Food |
NAICS | 311111: Dog and Cat Food Manufacturing |
SIC | 2047: Dog and Cat Food |
Sales Range | $50 M to 100M |
# of Employees | 89 |
Plant Area |
200,000
ft2
|
Annual Production | 100,000
ton
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $265,695 | 2,806,535 |
kWh
|
$0.095 |
Electricity Demand | $343,133 | 7,560 |
kW-mo/yr
|
$45.39 |
Electricity Fees | $23,700 | - |
|
- |
Natural Gas | $348,611 | 27,575 |
MMBtu
|
$12.64 |
TOTAL YEARLY COSTS | $981,139 | |||
RECOMMENDED SAVINGS* | $760,741 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $759,001 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4151: Develop a repair/replace policy | $1,124 | $98 |
$575
6,069
kWh
|
$549
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $32,814 | $77,773 |
$14,385
151,905
kWh
|
$18,429
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $680 | $1,830 |
$341
3,600
kWh
|
$327
-
kW-mo/yr
|
$12 | - | |
04 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $372,017 | $505,200 |
$242,905
2,565,000
kWh
|
$326,808
-
kW-mo/yr
|
$(-51,300.0) |
$(-146,396.0)
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,338 | $500 |
$1,338
14,129
kWh
|
- | - | - | |
06 | 2.9114: Use solar heat to make electricty | $219,112 | $395,439 |
$51,895
547,995
kWh
|
$167,217
-
kW-mo/yr
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $28,972 | $66,845 |
$14,038
148,153
kWh
|
$14,934
-
kW-mo/yr
|
- | - | |
08 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $102,944 | - | - |
$102,944
-
kW-mo/yr
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,740 | $4,578 |
$764
8,064
kWh
|
$976
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $760,741 | $1,052,263 |
$326,241
3,444,915
kWh
|
$632,184
-
kW-mo/yr
|
$(-51,288.0) |
$(-146,396.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $759,001 | $1,047,685 |
$325,477
3,436,851
kWh
|
$631,208
-
kW-mo/yr
|
$(-51,288.0) |
$(-146,396.0)
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs