Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,228

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Gaskets, packing, and sealing devices and rubber
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0418 #04 Y:2002 Cover open tanks $3,000 -
AM0418 #03 Y:2002 Repair and eliminate steam leaks $9,500 $200
AM0418 #02 Y:2002 Install equipment to move product $20,000 $6,000
AM0418 #01 Y:2002 Repair or replace steam traps $33,700 $4,735
IA0287 #07 Y:2002 Increase use of automation $112,320 $132,000
IA0287 #06 Y:2002 Install automatic packing equipment $55,665 $150,000
IA0287 #05 Y:2002 Adjust burners for efficient operation $337 $400
IA0287 #04 Y:2002 Recover waste heat from equipment $7,641 $10,125
IA0287 #03 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $3,342 $9,785
IA0287 #02 Y:2002 Reduce the pressure of compressed air to the minimum required $827 $20
IA0287 #01 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $2,719 $452
SU0132 #10 Y:2002 Install compressor air intakes in coolest locations $48 $79
SU0132 #09 Y:2002 Reduce the pressure of compressed air to the minimum required $154 -
SU0132 #08 Y:2002 Recover waste heat from equipment $290 $107
SU0132 #07 Y:2002 Install vinyl strip / high speed / air curtain doors $357 $40
SU0132 #06 Y:2002 Install vinyl strip / high speed / air curtain doors $451 $809
SU0132 #05 Y:2002 Make a practice of turning off lights when not needed $1,123 -
SU0132 #04 Y:2002 Re-arrange equipment layout to reduce handling costs $5,586 $392
SU0132 #03 Y:2002 Install timers and/or thermostats $5,704 $472
SU0132 #02 Y:2002 Reduce illumination to minimum necessary levels $6,727 $8,057