ITAC Assessment: AM0418
ITAC logo
ITAC Assessment: AM0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Rubber gaskets, packing, sealing devices
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 43,400
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 5,952
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,514 5,028,232
kWh
Electricity Demand $77,345 12,641
kW-mo/yr
Electricity Fees $5,529 -
Natural Gas $297,512 44,140
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,258

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2113: Repair or replace steam traps $33,700 $4,735 - $33,700
-
MMBtu
- - -
02 4.445: Install equipment to move product $20,000 $6,000 - - $20,000 - -
03 2.2135: Repair and eliminate steam leaks $9,500 $200 - $9,500
-
MMBtu
- - -
04 2.2514: Cover open tanks $3,000 - - - - - $3,000
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,400 $930 $300
6,000
kWh
- $2,100 - -
06 2.5122: Replace high resistance ducts, pipes, and fittings $1,650 $1,080 $1,650
33,000
kWh
- - - -
07 2.2511: Insulate bare equipment $1,600 $480 - $1,600
-
MMBtu
- - -
08 2.7124: Make a practice of turning off lights when not needed $1,400 $140 $1,400
28,600
kWh
- - - -
09 2.2511: Insulate bare equipment $1,300 $310 - $1,300
-
MMBtu
- - -
10 2.8123: Pay utility bills on time $1,008 - - - - $1,008 -
TOTAL RECOMMENDED $75,558 $13,875 $3,350
67,600
kWh
$46,100
-
MMBtu
$22,100 $1,008 $3,000
TOTAL IMPLEMENTED $67,258 $12,155 $3,050
61,600
kWh
$43,200
-
MMBtu
$20,000 $1,008 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs