Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tires and inner tubes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0322 #02 Y:2007 Utilize higher efficiency lamps and/or ballasts $180,588 $443,666
MS0322 #01 Y:2007 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $573,726 $6,271,690
GT0813 #08 Y:2005 Reduce the pressure of compressed air to the minimum required $5,865 $3,500
GT0813 #07 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $16,974 $1,250
GT0813 #06 Y:2005 Use synthetic lubricant $22,247 -
GT0813 #05 Y:2005 Use cooling tower or economizer to replace chiller cooling $4,836 -
GT0813 #04 Y:2005 Utilize higher efficiency lamps and/or ballasts $18,158 $41,528
GT0813 #03 Y:2005 Utilize energy-efficient belts and other improved mechanisms $2,172 $565
GT0813 #02 Y:2005 Use waste heat from hot flue gases to preheat $7,360 $8,000
GT0813 #01 Y:2005 Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,381 -
OK0671 #07 Y:2003 Use or replace with energy efficient substitutes $114,000 $86,000
OK0671 #06 Y:2003 Analyze flue gas for proper air/fuel ratio $4,592 $9,500
OK0671 #05 Y:2003 Insulate bare equipment $1,789 $5,340
OK0671 #04 Y:2003 Insulate bare equipment $459 $863
OK0671 #03 Y:2003 Insulate bare equipment $880 $318
OK0671 #02 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $3,474 $12,625
OK0671 #01 Y:2003 Reduce the pressure of compressed air to the minimum required $1,945 $4,565
MS0229 #07 Y:2003 Utilize energy-efficient belts and other improved mechanisms $61 $140
MS0229 #06 Y:2003 Install timers and/or thermostats $434 $472
MS0229 #05 Y:2003 Repair and eliminate steam leaks $967 $67