ITAC Assessment: GT0813
ITAC logo
ITAC Assessment: GT0813
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Rubber Tread
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range $100
M
to 500
M
# of Employees 135
Plant Area 475,000
ft2
Annual Production 57,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $655,289 17,689,343
kWh
Electricity Demand $327,644 48,700
kW-mo/yr
Electricity Fees $73,984 -
Natural Gas $428,797 48,795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,760

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,381 - - $5,381
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $7,360 $8,000 - - $7,360
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,172 $565 $1,554
39,752
kWh
$618
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $18,158 $41,528 $14,511
371,129
kWh
$3,647
-
kW-mo/yr
-
05 2.2614: Use cooling tower or economizer to replace chiller cooling $4,836 - $3,252
83,160
kWh
$1,584
-
kW-mo/yr
-
06 2.4314: Use synthetic lubricant $22,247 - $16,674
426,437
kWh
$5,573
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,974 $1,250 $12,166
311,144
kWh
$4,808
-
kW-mo/yr
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $5,865 $3,500 $4,216
107,815
kWh
$1,649
-
kW-mo/yr
-
TOTAL RECOMMENDED $82,993 $54,843 $52,373
1,339,437
kWh
$23,260
-
kW-mo/yr
$7,360
-
MMBtu
TOTAL IMPLEMENTED $62,760 $42,778 $43,351
1,108,710
kWh
$19,409
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs