Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

261

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tires and inner tubes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0317 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,968 $2,475
TT0317 #06 Y:2024 Reschedule plant operations or reduce load to avoid peaks $169,411 $120,000
TT0317 #05 Y:2024 Insulate bare equipment $2,015 $1,364
TT0317 #04 Y:2024 Use waste heat from hot flue gases to preheat $19,788 $13,300
TT0317 #03 Y:2024 Utilize controls to operate equipment only when needed $859 $400
TT0317 #02 Y:2024 Repair or replace steam traps $79,406 $13,250
TT0317 #01 Y:2024 Begin a practice of predictive / preventative maintenance $374,993 $42,000
LE0515 #07 Y:2021 Replace existing hvac unit with high efficiency model $622 $3,000
LE0515 #06 Y:2021 Use or replace with energy efficient substitutes $150,000 $700,000
LE0515 #05 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,658 $6,990
LE0515 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $8,979 $10,500
LE0515 #03 Y:2021 Install compressor air intakes in coolest locations $1,441 $1,500
LE0515 #02 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $2,306 $1,500
LE0515 #01 Y:2021 Reduce the pressure of compressed air to the minimum required $2,213 -
TT0214 #07 Y:2018 Utilize higher efficiency lamps and/or ballasts $5,443 $15,674
TT0214 #06 Y:2018 Optimize plant power factor $13,401 $5,000
TT0214 #05 Y:2018 Size electric motors for peak operating efficiency $23,715 $75,000
TT0214 #04 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $24,330 $66,000
TT0214 #03 Y:2018 Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $24,664 $106,000
TT0214 #02 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $64,974 $152,490