ITAC Assessment: TT0214
ITAC logo
ITAC Assessment: TT0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Bus and Light Truck Tires
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 1,000
Plant Area 2,002,087
ft2
Annual Production 3,257,625
units
Production Hrs. Annual 8,568
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $5,520,408 156,833,959
kWh
Electricity Demand $2,547,796 238,918
kW-mo/yr
Natural Gas $1,556,028 466,658
MMBtu
Waste Disposal Costs
Water Usage $682,911 326,951,836
Tgal
Water Disposal $417,942 91,629
Tgal
TOTAL YEARLY COSTS $10,725,085
RECOMMENDED SAVINGS* $379,956 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $236,830

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $223,429 $3,000 - - - $223,429
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $64,974 $152,490 - - - - $64,974
03 2.3411: Replace electric motors with back pressure steam turbines and use exhaust steam for process heat $24,664 $106,000 $21,584
613,200
kWh
$8,958
-
kW-mo/yr
- $(-5,878.0)
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,330 $66,000 $14,943
424,512
kWh
$9,387
-
kW-mo/yr
- - -
05 2.4131: Size electric motors for peak operating efficiency $23,715 $75,000 $16,664
473,419
kWh
$7,051
-
kW-mo/yr
- - -
06 2.3212: Optimize plant power factor $13,401 $5,000 - - $13,401 - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,443 $15,674 $2,704
76,821
kWh
$2,739
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $379,956 $423,164 $55,895
1,587,952
kWh
$28,135
-
kW-mo/yr
$13,401 $217,551
-
MMBtu
$64,974
TOTAL IMPLEMENTED $236,830 $8,000 - - $13,401 $223,429
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs