Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product PVC Pipe
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $5
M
to 10
M
# of Employees 28
Plant Area 34,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,640
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,191 5,097,890
kWh
Electricity Demand $17,376 9,505
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,597 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings By-product Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,676 $18,899 $6,333
119,578
kWh
$343
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $954 $5,432 $908
16,999
kWh
$46
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,538 $2,350 $11,538
202,521
kWh
- - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $3,147 $2,000 - - $2,400
-
lb
- $747
05 4.431: Train operators for maximum operating efficiency $15,282 - - - - $15,282 -
TOTAL RECOMMENDED $37,597 $28,681 $18,779
339,098
kWh
$389
-
kW-mo/yr
$2,400
-
lb
$15,282 $747
TOTAL IMPLEMENTED $34,450 $26,681 $18,779
339,098
kWh
$389
-
kW-mo/yr
- $15,282 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs