Assessment Year | 2021 |
---|---|
Principal Product | Tire Retreading |
NAICS | 326212: Tire Retreading |
SIC | 3011: Tires and Inner Tubes |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
95,000
ft2
|
Annual Production | 85,000
units
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,488 | 1,851,000 |
kWh
|
$0.071 |
Electricity Demand | $18,487 | 5,282 |
kW-mo/yr
|
$3.50 |
Electricity Fees | $4,033 | - |
|
- |
Natural Gas | $91,507 | 12,497 |
MMBtu
|
$7.32 |
TOTAL YEARLY COSTS | $245,515 | |||
RECOMMENDED SAVINGS* | $167,219 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $157,618 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,213 | - |
$1,929
27,164
kWh
|
$284
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,306 | $1,500 |
$2,011
28,316
kWh
|
$295
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,441 | $1,500 |
$1,255
17,685
kWh
|
$186
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,979 | $10,500 |
$7,918
111,527
kWh
|
$1,061
-
kW-mo/yr
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,658 | $6,990 |
$1,462
20,597
kWh
|
$196
-
kW-mo/yr
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $150,000 | $700,000 | - | - | $150,000 | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $622 | $3,000 |
$584
8,223
kWh
|
$38
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $167,219 | $723,490 |
$15,159
213,512
kWh
|
$2,060
-
kW-mo/yr
|
$150,000 | ||
TOTAL IMPLEMENTED | $157,618 | $709,990 |
$6,657
93,762
kWh
|
$961
-
kW-mo/yr
|
$150,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs