| Assessment Year | 2008 |
|---|---|
| Principal Product | Corrugated packaging materials |
| NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
| SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
| Sales Range | $10 M to 50M |
| # of Employees | 105 |
| Plant Area |
147,000
ft2
|
| Annual Production | 18,000,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $114,187 | 2,344,708 |
kWh
|
$0.049 |
| Electricity Demand | $21,125 | 6,881 |
kW-mo/yr
|
$3.07 |
| Electricity Fees | $7,575 | - |
|
- |
| Natural Gas | $156,556 | 13,894 |
MMBtu
|
$11.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,642 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,285 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $10,481 | $5,000 | - | - |
$10,481
-
MMBtu
|
- | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,352 | $100 |
$4,156
85,342
kWh
|
$756
-
kW-mo/yr
|
- | $(-1,200.0) | $(-360.0) | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,929 | $7,700 |
$3,325
68,274
kWh
|
$604
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.4151: Develop a repair/replace policy | $1,428 | $3,142 |
$1,208
24,815
kWh
|
$220
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.2136: Install / repair insulation on steam lines | $1,068 | $271 | - | - |
$1,068
-
MMBtu
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,272 | $5,000 |
$4,207
86,395
kWh
|
$766
-
kW-mo/yr
|
- | $(-1,068.0) | $367 | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,112 | $500 |
$941
19,323
kWh
|
$171
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $25,642 | $21,713 |
$13,837
284,149
kWh
|
$2,517
-
kW-mo/yr
|
$11,549
-
MMBtu
|
$(-2,268.0) | $7 | ||
| TOTAL IMPLEMENTED | $20,285 | $10,871 |
$9,304
191,060
kWh
|
$1,693
-
kW-mo/yr
|
$11,549
-
MMBtu
|
$(-2,268.0) | $7 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs