Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

269

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Tires and inner tubes
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0098 #06 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $9,139 $22,860
UA0098 #05 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $7,024 $34,540
UA0098 #04 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $69,733 $36,138
UA0098 #03 Y:2013 Eliminate or reduce compressed air usage $25,411 $3,500
UA0098 #02 Y:2013 Upgrade controls on compressors $51,977 $20,000
UA0098 #01 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $55,414 $35,390
UA0085 #10 Y:2012 Install desiccant humidity control system $529,960 $400,000
UA0085 #09 Y:2012 Utilize higher efficiency lamps and/or ballasts $349,571 $177,363
UA0085 #08 Y:2012 Install adequate dryers on air lines to eliminate blowdown $48,968 $131,587
UA0085 #07 Y:2012 Reduce the pressure of compressed air to the minimum required $58,443 $1,920
UA0085 #06 Y:2012 Use / purchase optimum sized compressor $146,229 $68,100
UA0085 #05 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $151,364 $35,390
UA0085 #04 Y:2012 Use adjustable frequency drive or multiple speed motors on existing system $10,936 $7,682
UA0085 #03 Y:2012 Use steam pressure reduction to generate power $86,957 $214,808
UA0085 #02 Y:2012 Install / repair insulation on steam lines $164,656 $57,024
UA0085 #01 Y:2012 Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $6,264,801 $14,443,176
SU0318 #09 Y:2012 Upgrade obsolete equipment $211 $795
SU0318 #08 Y:2012 Conserve energy by efficient use of vending machines $812 $3,107
SU0318 #07 Y:2012 Optimize plant power factor $162,692 $408,153
SU0318 #06 Y:2012 Reduce ventilation air $3,491 $4,419