ITAC Assessment: SU0318
ITAC logo
ITAC Assessment: SU0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Automotive Tires
NAICS 326211: Tire Manufacturing (except Retreading)
SIC 3011: Tires and Inner Tubes
Sales Range greater than $500
M
# of Employees 1,323
Plant Area 2,000,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,483,736 89,674,716
kWh
Electricity Demand $1,268,784 158,598
kW-mo/yr
Electricity Fees $166,153 -
Natural Gas $2,981,865 581,871
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $306,618 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $277,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $12,626 - $8,483
169,647
kWh
$1,896
-
kW-mo/yr
- - - $2,247
02 2.4314: Use synthetic lubricant $7,917 - $6,469
129,377
kWh
$1,448
-
kW-mo/yr
- - - -
03 2.7124: Make a practice of turning off lights when not needed $72 - $72
1,440
kWh
- - - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $106,547 $32,436 $(-6,769.0)
(-135,374)
kWh
$(-1,520.0)
-
kW-mo/yr
- $114,836
-
MMBtu
- -
05 3.1161: Eliminate/reduce an operation $12,250 $11,115 $(-325.0)
(-6,506)
kWh
$(-2,592.0)
-
kW-mo/yr
- - $5,720 $9,447
06 2.7314: Reduce ventilation air $3,491 $4,419 $471
9,419
kWh
$240
-
kW-mo/yr
- $2,780
-
MMBtu
- -
07 2.3212: Optimize plant power factor $162,692 $408,153 - - $162,692 - - -
08 2.6211: Conserve energy by efficient use of vending machines $812 $3,107 $812
16,230
kWh
- - - - -
09 2.4321: Upgrade obsolete equipment $211 $795 $171
3,427
kWh
$40
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $306,618 $460,025 $9,384
187,660
kWh
$(-488.0)
-
kW-mo/yr
$162,692 $117,616
-
MMBtu
$5,720 $11,694
TOTAL IMPLEMENTED $277,439 $441,384 $(-57.0)
(-1,130)
kWh
$(-32.0)
-
kW-mo/yr
$162,692 $114,836
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs