ITAC Assessment: OK0719
ITAC logo
ITAC Assessment: OK0719
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Roofing asphalt
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 12
Plant Area 326,700
ft2
Annual Production 200,000
ton
Production Hrs. Annual 6,318
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,649 1,554,720
kWh
Electricity Demand $44,216 5,379
kW-mo/yr
Natural Gas $375,129 54,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,149 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2414: Use waste heat from hot flue gases to preheat $56,779 $157,975 - - $56,779
-
MMBtu
-
02 2.2135: Repair and eliminate steam leaks $13,491 $550 - - $13,491
-
MMBtu
-
03 2.2515: Use optimum thickness insulation $3,078 $1,637 - - $3,078
-
MMBtu
-
04 2.2511: Insulate bare equipment $249 $1,098 - - $249
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $282 $80 $284
7,530
kWh
$118
-
kW-mo/yr
- $(-120.0)
06 2.7221: Lower temperature during the winter season and vice-versa $221 $225 $221
5,862
kWh
- - -
07 2.7135: Install occupancy sensors $49 $92 $49
1,301
kWh
- - -
TOTAL RECOMMENDED $74,149 $161,657 $554
14,693
kWh
$118
-
kW-mo/yr
$73,597
-
MMBtu
$(-120.0)
TOTAL IMPLEMENTED $17,072 $2,492 $505
13,392
kWh
$118
-
kW-mo/yr
$16,569
-
MMBtu
$(-120.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs