Assessment Year | 2005 |
---|---|
Principal Product | Roofing asphalt |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 12 |
Plant Area |
326,700
ft2
|
Annual Production | 200,000
ton
|
Production Hrs. Annual | 6,318
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,649 | 1,554,720 |
kWh
|
$0.038 |
Electricity Demand | $44,216 | 5,379 |
kW-mo/yr
|
$8.22 |
Natural Gas | $375,129 | 54,936 |
MMBtu
|
$6.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,149 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,072 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $56,779 | $157,975 | - | - |
$56,779
-
MMBtu
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $13,491 | $550 | - | - |
$13,491
-
MMBtu
|
- | |
03 | 2.2515: Use optimum thickness insulation | $3,078 | $1,637 | - | - |
$3,078
-
MMBtu
|
- | |
04 | 2.2511: Insulate bare equipment | $249 | $1,098 | - | - |
$249
-
MMBtu
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $282 | $80 |
$284
7,530
kWh
|
$118
-
kW-mo/yr
|
- | $(-120.0) | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $221 | $225 |
$221
5,862
kWh
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $49 | $92 |
$49
1,301
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $74,149 | $161,657 |
$554
14,693
kWh
|
$118
-
kW-mo/yr
|
$73,597
-
MMBtu
|
$(-120.0) | ||
TOTAL IMPLEMENTED | $17,072 | $2,492 |
$505
13,392
kWh
|
$118
-
kW-mo/yr
|
$16,569
-
MMBtu
|
$(-120.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs