Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,782

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rubber and miscellaneous plastics products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0259 #06 Y:2002 Install compressor air intakes in coolest locations $494 $185
WV0259 #05 Y:2002 Reduce the pressure of compressed air to the minimum required $1,897 $50
WV0259 #04 Y:2002 Utilize higher efficiency lamps and/or ballasts $144 $136
WV0259 #03 Y:2002 Utilize higher efficiency lamps and/or ballasts $6,449 $10,381
WV0259 #02 Y:2002 Use optimum thickness insulation $2,207 $375
WV0259 #01 Y:2002 Utilize energy-efficient belts and other improved mechanisms $217 $450
UD0661 #13 Y:2002 Install compressor air intakes in coolest locations $663 $375
UD0661 #12 Y:2002 Disconnect ballasts $811 $45
UD0661 #11 Y:2002 Reduce illumination to minimum necessary levels $1,059 $1,513
UD0661 #10 Y:2002 Reduce the pressure of compressed air to the minimum required $1,325 -
UD0661 #09 Y:2002 Upgrade controls on compressors $1,624 -
UD0661 #08 Y:2002 Recharge batteries on during off-peak demand periods $1,620 -
UD0661 #07 Y:2002 Utilize higher efficiency lamps and/or ballasts $1,953 $4,602
UD0661 #06 Y:2002 Make a practice of turning off lights when not needed $2,028 -
UD0661 #05 Y:2002 Utilize higher efficiency lamps and/or ballasts $2,118 $4,730
UD0661 #04 Y:2002 Reschedule plant operations or reduce load to avoid peaks $5,298 -
UD0661 #03 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $5,827 $18,100
UD0661 #02 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $37,395 $144,000
UD0661 #01 Y:2002 Change rate schedules or other changes in utility service $37,700 $25,000
UD0659 #15 Y:2002 Disconnect ballasts $392 $35