Assessment Year | 2003 |
---|---|
Principal Product | Injection molded plastic parts |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 105 |
Plant Area |
60,000
ft2
|
Annual Production | 13,536,904
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $269,807 | 9,907,200 |
kWh
|
$0.027 |
Electricity Demand | $280,820 | 21,180 |
kW-mo/yr
|
$13.26 |
Natural Gas | $13,774 | 2,299 |
MMBtu
|
$5.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,421 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $37,700 | $25,000 | - | - | $38,700 | - | $(-1,000.0) | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $37,395 | $144,000 |
$14,602
561,600
kWh
|
$22,793
-
kW-mo/yr
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,827 | $18,100 |
$2,855
109,824
kWh
|
$2,972
-
kW-mo/yr
|
- | - | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,298 | - | - |
$4,778
-
kW-mo/yr
|
- | $520 | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,118 | $4,730 |
$1,038
39,936
kWh
|
$1,080
-
kW-mo/yr
|
- | - | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $2,028 | - |
$492
18,928
kWh
|
$1,536
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,953 | $4,602 |
$957
36,816
kWh
|
$996
-
kW-mo/yr
|
- | - | - | |
08 | 2.3132: Recharge batteries on during off-peak demand periods | $1,620 | - | - |
$1,620
-
kW-mo/yr
|
- | - | - | |
09 | 2.4224: Upgrade controls on compressors | $1,624 | - |
$780
30,000
kWh
|
$844
-
kW-mo/yr
|
- | - | - | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,325 | - |
$650
24,960
kWh
|
$675
-
kW-mo/yr
|
- | - | - | |
11 | 2.7111: Reduce illumination to minimum necessary levels | $1,059 | $1,513 |
$519
19,968
kWh
|
$540
-
kW-mo/yr
|
- | - | - | |
12 | 2.7122: Disconnect ballasts | $811 | $45 |
$397
15,288
kWh
|
$414
-
kW-mo/yr
|
- | - | - | |
13 | 2.4221: Install compressor air intakes in coolest locations | $663 | $375 |
$325
12,480
kWh
|
$338
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $99,421 | $198,365 |
$22,615
869,800
kWh
|
$38,586
-
kW-mo/yr
|
$38,700 | $520 | $(-1,000.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs