ITAC Assessment: LE0534
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Sewage Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 1,200,000
ft2
Annual Production 28,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,419,135 17,622,865
kWh
Electricity Demand $141,414 33,494
kW-mo/yr
Electricity Fees $48,000 -
Natural Gas $1,158,864 378,694
MMBtu
TOTAL YEARLY COSTS $2,767,413
RECOMMENDED SAVINGS* $702,011 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,351 $8,500 $19,796
244,390
kWh
$7,555
-
kW-mo/yr
- -
02 2.4322: Use or replace with energy efficient substitutes $201,245 $160,000 $190,349
2,349,884
kWh
$10,896
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $10,191 $15,400 $9,765
120,557
kWh
$426
-
kW-mo/yr
- -
04 2.4226: Use / purchase optimum sized compressor $358,386 $550,000 $334,433
4,128,808
kWh
$23,953
-
kW-mo/yr
- -
05 2.2441: Preheat boiler makeup water with waste process heat $10,899 $50,000 $(-5,287.0)
(-65,170)
kWh
$(-380.0)
-
kW-mo/yr
$16,566
-
MMBtu
-
06 2.4322: Use or replace with energy efficient substitutes $93,939 $600,000 $22,644
279,552
kWh
$1,295
-
kW-mo/yr
- $70,000
TOTAL RECOMMENDED $702,011 $1,383,900 $571,700
7,058,021
kWh
$43,745
-
kW-mo/yr
$16,566
-
MMBtu
$70,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs