Assessment Year | 2022 |
---|---|
Principal Product | Sewage Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
1,200,000
ft2
|
Annual Production | 28,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,419,135 | 17,622,865 |
kWh
|
$0.081 |
Electricity Demand | $141,414 | 33,494 |
kW-mo/yr
|
$4.22 |
Electricity Fees | $48,000 | - |
|
- |
Natural Gas | $1,158,864 | 378,694 |
MMBtu
|
$3.06 |
TOTAL YEARLY COSTS | $2,767,413 | |||
RECOMMENDED SAVINGS* | $702,011 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,351 | $8,500 |
$19,796
244,390
kWh
|
$7,555
-
kW-mo/yr
|
- | - | |
02 | 2.4322: Use or replace with energy efficient substitutes | $201,245 | $160,000 |
$190,349
2,349,884
kWh
|
$10,896
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,191 | $15,400 |
$9,765
120,557
kWh
|
$426
-
kW-mo/yr
|
- | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $358,386 | $550,000 |
$334,433
4,128,808
kWh
|
$23,953
-
kW-mo/yr
|
- | - | |
05 | 2.2441: Preheat boiler makeup water with waste process heat | $10,899 | $50,000 |
$(-5,287.0)
(-65,170)
kWh
|
$(-380.0)
-
kW-mo/yr
|
$16,566
-
MMBtu
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $93,939 | $600,000 |
$22,644
279,552
kWh
|
$1,295
-
kW-mo/yr
|
- | $70,000 | |
TOTAL RECOMMENDED | $702,011 | $1,383,900 |
$571,700
7,058,021
kWh
|
$43,745
-
kW-mo/yr
|
$16,566
-
MMBtu
|
$70,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs