ITAC Assessment: SF0582
ITAC logo
ITAC Assessment: SF0582
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Tomato Sauce
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 190
Plant Area 225,000
ft2
Annual Production 4,660,000
units
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $565,664 5,024,552
kWh
Electricity Demand $304,162 12,288
kW-mo/yr
Natural Gas $309,351 40,562
MMBtu
TOTAL YEARLY COSTS $1,179,177
RECOMMENDED SAVINGS* $130,482 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $127,536

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,960 - $21,960
146,181
kWh
- -
02 4.454: Modify startup/shutdown times $7,144 - $7,144
75,357
kWh
- -
03 2.2136: Install / repair insulation on steam lines $29,881 $2,290 - - $29,881
-
MMBtu
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $10,294 $2,290 - - $10,294
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $22,836 $41,117 $17,477
109,372
kWh
$5,359
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,257 $45,587 $24,257
151,795
kWh
- -
07 2.4239: Eliminate or reduce compressed air usage $8,094 $17,764 $8,094
50,654
kWh
- -
08 2.2511: Insulate bare equipment $376 $961 - - $376
-
MMBtu
09 2.1243: Use heat from boiler blowdown to preheat boiler feed water $3,070 $11,782 - - $3,070
-
MMBtu
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,570 $11,279 $2,570
16,083
kWh
- -
TOTAL RECOMMENDED $130,482 $133,070 $81,502
549,442
kWh
$5,359
-
kW-mo/yr
$43,621
-
MMBtu
TOTAL IMPLEMENTED $127,536 $120,830 $78,932
533,359
kWh
$5,359
-
kW-mo/yr
$43,245
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs