Assessment Year | 2024 |
---|---|
Principal Product | axle shafts |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 320 |
Plant Area |
100,000
ft2
|
Annual Production | 2,260,700
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $1,271,805 | 14,344,797 |
kWh
|
$0.089 | |
Electricity Demand | $177,295 | 34,483 |
kW-mo/yr
|
$5.14 | |
Electricity Fees | $26,988 | - |
|
- | |
Natural Gas | $221,605 | 30,259 |
MMBtu
|
$7.32 | |
Waste Disposal Costs | |||||
Water Usage | $33,174 | 1,249 |
Tgal
|
$26.56 | |
Water Disposal | $29,929 | 1,249 |
Tgal
|
$23.96 | |
TOTAL YEARLY COSTS | $1,760,796 | ||||
RECOMMENDED SAVINGS* | $204,232 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $1,629 | - | - |
$1,244
-
kW-mo/yr
|
- | - | - | $385 | |
02 | 2.3212: Optimize plant power factor | $14,981 | $56,840 | - | - | - | - | - | $14,981 | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,005 | $34,270 |
$26,026
289,182
kWh
|
$4,978
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4322: Use or replace with energy efficient substitutes | $7,936 | $18,703 |
$7,151
79,456
kWh
|
$785
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,606 | $17 |
$2,348
26,094
kWh
|
$258
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.6218: Turn off equipment when not in use | $5,088 | - |
$4,521
50,232
kWh
|
$567
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,694 | $706 |
$1,310
14,560
kWh
|
$384
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $2,871 | - | - | - |
$2,871
-
MMBtu
|
- | - | - | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $38,860 | $12,105 |
$(-510.3)
(-5,670)
kWh
|
$(-332.0)
-
kW-mo/yr
|
$39,702
-
MMBtu
|
- | - | - | |
10 | 2.7492: Use proper thickness of insulation on building envelope | $5,014 | $4,165 | - | - |
$5,014
-
MMBtu
|
- | - | - | |
11 | 2.7496: Install partitions to reduce size of conditioned space | $1,256 | $1,302 | - | - |
$1,256
-
MMBtu
|
- | - | - | |
12 | 3.4151: Minimize water usage | $25,914 | $8,239 | - | - | - |
$13,623
-
Tgal
|
$12,291
-
Tgal
|
- | |
13 | 3.4151: Minimize water usage | $60,609 | $146,420 | - | - | - | - | - | $60,609 | |
14 | 4.821: Pay bills on time to avoid late fees | $4,768 | - | - | - | - | - | - | $4,768 | |
TOTAL RECOMMENDED | $204,232 | $282,768 |
$40,847
453,854
kWh
|
$7,884
-
kW-mo/yr
|
$48,843
-
MMBtu
|
$13,623
-
Tgal
|
$12,291
-
Tgal
|
$80,743 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs