Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,473

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rubber and miscellaneous plastics products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0248 #04 Y:2025 Recharge batteries on during off-peak demand periods $1,542 -
WM0248 #03 Y:2025 Upgrade controls on compressors $2,386 $3,535
WM0248 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $6,724 -
WM0248 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $22,211 $20,406
DL0266 #09 Y:2025 Lower ceiling to reduce conditioned space $2,537 $20,700
DL0266 #08 Y:2025 Use proper thickness of insulation on building envelope $1,533 $7,200
DL0266 #07 Y:2025 Improve air circulation with destratification fans / other methods $988 $5,100
DL0266 #06 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,511 $2,607
DL0266 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,109 $9,700
DL0266 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $317 $500
DL0266 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $689 $1,400
DL0266 #02 Y:2025 Recover heat from exhausted steam, hot air or hot water $1,212 $2,300
DL0266 #01 Y:2025 Reduce space conditioning during non-working hours $1,316 -
NL0122 #07 Y:2025 Reschedule plant operations or reduce load to avoid peaks $931 $90
NL0122 #06 Y:2025 Change rate schedules or other changes in utility service $1,242 $120
NL0122 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,650 $12,200
NL0122 #04 Y:2025 Turn off equipment when not in use $5,864 $120
NL0122 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,944 $13,202
NL0122 #02 Y:2025 Optimize plant power factor $10,000 $15,600
NL0122 #01 Y:2025 Use waste heat from hot flue gases to preheat $58,962 $417,000