Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17,602

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Rubber and miscellaneous plastics products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0608 #08 Y:2025 Use properly designed and sized hvac equipment $2,899 $19,500
LE0608 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $712 $3,905
LE0608 #06 Y:2025 Preheat combustion air with waste heat $1,620 $7,750
LE0608 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,119 $5,034
LE0608 #04 Y:2025 Install compressor air intakes in coolest locations $5,352 $4,000
LE0608 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $20,628 $2,200
LE0608 #02 Y:2025 Install timers and/or thermostats $9,619 -
LE0608 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $2,693 -
WM0256 #05 Y:2025 Install compressor air intakes in coolest locations $1,150 $5,288
WM0256 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $3,409 $210
WM0256 #03 Y:2025 Use optimum size and capacity equipment $9,367 $29,591
WM0256 #02 Y:2025 Use cooling air which cools hot work pieces for space heating $14,873 $10,258
WM0256 #01 Y:2025 Use antifreeze in cooling towers to allow winter use $27,625 $19,139
TT0349 #12 Y:2025 Install occupancy sensors $1,209 $1,380
TT0349 #11 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,862 $23,400
TT0349 #10 Y:2025 Use power during off-peak periods $11,088 -
TT0349 #09 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $19,958 $405
TT0349 #08 Y:2025 Eliminate or reduce compressed air usage $26,144 $122,000
TT0349 #07 Y:2025 Minimize operation of equipment maintained in standby condition $31,487 $9,660