Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

510

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Asphalt felts and coatings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0271 #09 Y:2003 Modify process to reduce material use/cost $8,073 $20,578
SF0271 #08 Y:2003 Use a less expensive method of waste removal $56,959 $350
SF0271 #07 Y:2003 Use waste heat from hot flue gases to preheat $142,307 $525,000
SF0271 #06 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $8,193 $15,000
SF0271 #05 Y:2003 Utilize higher efficiency lamps and/or ballasts $5,167 $8,360
SF0271 #04 Y:2003 Utilize higher efficiency lamps and/or ballasts $23,846 $38,640
SF0271 #03 Y:2003 Use photocell controls $2,225 $2,760
SF0271 #02 Y:2003 Reduce the pressure of compressed air to the minimum required $1,964 $567
SF0271 #01 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $7,393 $420
IA0326 #08 Y:2003 Utilize higher efficiency lamps and/or ballasts $46 $62
IA0326 #07 Y:2003 Utilize higher efficiency lamps and/or ballasts $321 $552
IA0326 #06 Y:2003 Use most efficient type of electric motors $1,079 $163
IA0326 #05 Y:2003 Insulate bare equipment $3,809 $673
IA0326 #04 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $504 $129
IA0326 #03 Y:2003 Reduce the pressure of compressed air to the minimum required $279 $24
IA0326 #02 Y:2003 Repair and eliminate steam leaks $7,772 $1,200
IA0326 #01 Y:2003 Analyze flue gas for proper air/fuel ratio $2,075 $1,000
IC0062 #09 Y:2003 Use waste heat from hot flue gases to preheat $33,052 $130,000
IC0062 #08 Y:2003 Reduce combustion air flow to optimum $75,511 $20,000
IC0062 #07 Y:2003 Use waste heat from hot flue gases to preheat $32,470 $28,470