ITAC Assessment: IC0062
ITAC logo
ITAC Assessment: IC0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Asphalt Products, Roofing Coatings, Mineral Rubber
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 110,000
ft2
Annual Production 200,000
ton
Production Hrs. Annual 6,952
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,549 5,479,370
kWh
Electricity Demand $164,353 11,685
kW-mo/yr
Electricity Fees $25,595 -
Natural Gas $1,294,849 342,949
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $229,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $192,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $3,452 $6,197 $1,870
45,671
kWh
$1,582
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,779 $14,546 $6,779
165,334
kWh
- -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,105 - - $3,105
-
kW-mo/yr
-
04 2.1113: Reduce combustion air flow to optimum $8,560 $5,280 - - $8,560
-
MMBtu
05 2.2135: Repair and eliminate steam leaks $45,681 $10,200 - - $45,681
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $20,526 $21,542 - - $20,526
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $32,470 $28,470 - - $32,470
-
MMBtu
08 2.1113: Reduce combustion air flow to optimum $75,511 $20,000 - - $75,511
-
MMBtu
09 2.2414: Use waste heat from hot flue gases to preheat $33,052 $130,000 - - $33,052
-
MMBtu
TOTAL RECOMMENDED $229,136 $236,235 $8,649
211,005
kWh
$4,687
-
kW-mo/yr
$215,800
-
MMBtu
TOTAL IMPLEMENTED $192,632 $100,038 $6,779
165,334
kWh
$3,105
-
kW-mo/yr
$182,748
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs