500
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Asphalt felts and coatings | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
AM0871 #10 Y:2022 | 10 | 2022 | Make a practice of turning off lights when not needed | $525 | - | |
AM0871 #09 Y:2022 | 09 | 2022 | Utilize higher efficiency lamps and/or ballasts | $694 | $588 | |
AM0871 #08 Y:2022 | 08 | 2022 | Apply for tax-free status for energy purchases | $3,600 | $2,000 | |
AM0871 #07 Y:2022 | 07 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $1,880 | $2,700 | |
AM0871 #06 Y:2022 | 06 | 2022 | Install occupancy sensors | $1,890 | $3,600 | |
AM0871 #05 Y:2022 | 05 | 2022 | Utilize energy-efficient belts and other improved mechanisms | $2,678 | $1,280 | |
AM0871 #04 Y:2022 | 04 | 2022 | Use synthetic lubricant | $3,265 | $500 | |
AM0871 #03 Y:2022 | 03 | 2022 | Optimize plant power factor | $6,228 | $23,380 | |
AM0871 #02 Y:2022 | 02 | 2022 | Reduce the pressure of compressed air to the minimum required | $6,840 | $30 | |
AM0871 #01 Y:2022 | 01 | 2022 | Insulate bare equipment | $7,430 | $10,320 | |
MA0846 #06 Y:2022 | 06 | 2022 | Turn off equipment during breaks, reduce operating time | $674 | $3,293 | |
MA0846 #05 Y:2022 | 05 | 2022 | Install occupancy sensors | $1,483 | $4,908 | |
MA0846 #04 Y:2022 | 04 | 2022 | Reduce the pressure of compressed air to the minimum required | $6,290 | $625 | |
MA0846 #03 Y:2022 | 03 | 2022 | Use adjustable frequency drive or multiple speed motors on existing system | $33,534 | $15,450 | |
MA0846 #02 Y:2022 | 02 | 2022 | Insulate bare equipment | $10,916 | $5,542 | |
MA0846 #01 Y:2022 | 01 | 2022 | Use solar heat to make electricty | $128,459 | $1,302,718 | |
MA0830 #06 Y:2021 | 06 | 2021 | Reduce temperature of process equipment when on standby | $4,017 | $2,500 | |
MA0830 #05 Y:2021 | 05 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $35,055 | $20,800 | |
MA0830 #04 Y:2021 | 04 | 2021 | Moderate cooling tower outlet temperature | $9,470 | $2,500 | |
MA0830 #03 Y:2021 | 03 | 2021 | Recover waste heat from equipment | $15,862 | $65,410 |