34
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Asphalt felts and coatings | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0897 #09 Y:2013 | 09 | 2013 | Use radiant heater for spot heating | $22,517 | $48,000 | |
| UD0897 #08 Y:2013 | 08 | 2013 | Utilize daylight whenever possible in lieu of artificial light | $142 | $900 | |
| UD0897 #07 Y:2013 | 07 | 2013 | Add area lighting switches | $664 | $600 | |
| UD0897 #06 Y:2013 | 06 | 2013 | Utilize higher efficiency lamps and/or ballasts | $3,409 | $5,020 | |
| UD0897 #05 Y:2013 | 05 | 2013 | Utilize energy-efficient belts and other improved mechanisms | $765 | - | |
| UD0897 #04 Y:2013 | 04 | 2013 | Turn off equipment when not in use | $2,897 | $5,000 | |
| UD0897 #03 Y:2013 | 03 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $755 | $1,000 | |
| UD0897 #02 Y:2013 | 02 | 2013 | Analyze flue gas for proper air/fuel ratio | $405 | - | |
| UD0897 #01 Y:2013 | 01 | 2013 | Analyze flue gas for proper air/fuel ratio | $10,780 | - | |
| UD0849 #08 Y:2011 | 08 | 2011 | Analyze flue gas for proper air/fuel ratio | $3,274 | $2,000 | |
| UD0849 #07 Y:2011 | 07 | 2011 | Use waste heat from hot flue gases to preheat | $7,241 | $11,000 | |
| UD0849 #06 Y:2011 | 06 | 2011 | Use waste heat from hot flue gases to preheat | $34,045 | $44,000 | |
| UD0849 #05 Y:2011 | 05 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,530 | $1,000 | |
| UD0849 #04 Y:2011 | 04 | 2011 | Install compressor air intakes in coolest locations | $3,199 | $500 | |
| UD0849 #03 Y:2011 | 03 | 2011 | Redesign flow to minimize mass transfer length | $14,632 | - | |
| UD0849 #02 Y:2011 | 02 | 2011 | Utilize energy-efficient belts and other improved mechanisms | $2,445 | - | |
| UD0849 #01 Y:2011 | 01 | 2011 | Utilize higher efficiency lamps and/or ballasts | $62,282 | $15,816 | |
| UD0493 #09 Y:1996 | 09 | 1996 | Use closed cycle process to minimize waste water production | $14,773 | $34,000 | |
| UD0493 #08 Y:1996 | 08 | 1996 | Replace city water with recycled water via cooling tower | $11,264 | $45,000 | |
| UD0493 #07 Y:1996 | 07 | 1996 | Utilize higher efficiency lamps and/or ballasts | $2,554 | $5,953 |