Assessment Year | 2022 |
---|---|
Principal Product | Roofing shingles |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
152,000
ft2
|
Annual Production | 313,583
ton
|
Production Hrs. Annual | 4,900
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $901,435 | 8,445,150 |
kWh
|
$0.11 | |
Electricity Demand | $454,837 | 21,057 |
kW-mo/yr
|
$21.60 | |
Electricity Fees | $1,080 | - |
|
- | |
Natural Gas | $1,031,865 | 127,679 |
MMBtu
|
$8.08 | |
Waste Disposal Costs | |||||
Water Usage | $154,349 | 16,159 |
Tgal
|
$9.55 | |
Water Disposal | $15,538 | 629 |
Tgal
|
$24.70 | |
TOTAL YEARLY COSTS | $2,559,104 | ||||
RECOMMENDED SAVINGS* | $223,531 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $118,337 | $192,000 | - |
$118,337
-
MMBtu
|
|
02 | 2.1113: Reduce combustion air flow to optimum | $40,790 | $80,000 | - |
$40,790
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $15,862 | $65,410 | - |
$15,862
-
MMBtu
|
|
04 | 2.2611: Moderate cooling tower outlet temperature | $9,470 | $2,500 |
$9,470
88,723
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $35,055 | $20,800 |
$35,055
328,417
kWh
|
- | |
06 | 2.6241: Reduce temperature of process equipment when on standby | $4,017 | $2,500 | - |
$4,017
-
MMBtu
|
|
TOTAL RECOMMENDED | $223,531 | $363,210 |
$44,525
417,140
kWh
|
$179,006
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs